考虑多目标和风险因素的众包项目任务分配模型及其应用

Xi-Zheng Zhang, Leshao Zhang, Wen Luo
{"title":"考虑多目标和风险因素的众包项目任务分配模型及其应用","authors":"Xi-Zheng Zhang, Leshao Zhang, Wen Luo","doi":"10.1145/3277139.3277177","DOIUrl":null,"url":null,"abstract":"Assigning tasks to workers for a crowdsourcing project is challenging and needs to consider worker capacity, project duration, total cost and some operational constraints. We formulate the problem as a tri-objective optimisation model, which minimises project duration while simultaneously achieving lower total cost and fewer workers under the considering the capacity risk of contractor. A heuristic algorithm is developed to obtain Pareto efficient solutions. we used the fuzzy AHP(analytic hierarchy process) to confirm the priority among the time cost and the number of selected workers in the process of collaborative manufacturing task allocation. Finally, we designed the heuristic algorithm to solve the multi- objectives model and verified the validity superiority of the algorithm through a specific example.","PeriodicalId":272703,"journal":{"name":"Proceedings of the 1st International Conference on Information Management and Management Science","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A task assignment model and its application for crowdsourcing project factored multi-objective and risks\",\"authors\":\"Xi-Zheng Zhang, Leshao Zhang, Wen Luo\",\"doi\":\"10.1145/3277139.3277177\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Assigning tasks to workers for a crowdsourcing project is challenging and needs to consider worker capacity, project duration, total cost and some operational constraints. We formulate the problem as a tri-objective optimisation model, which minimises project duration while simultaneously achieving lower total cost and fewer workers under the considering the capacity risk of contractor. A heuristic algorithm is developed to obtain Pareto efficient solutions. we used the fuzzy AHP(analytic hierarchy process) to confirm the priority among the time cost and the number of selected workers in the process of collaborative manufacturing task allocation. Finally, we designed the heuristic algorithm to solve the multi- objectives model and verified the validity superiority of the algorithm through a specific example.\",\"PeriodicalId\":272703,\"journal\":{\"name\":\"Proceedings of the 1st International Conference on Information Management and Management Science\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1st International Conference on Information Management and Management Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3277139.3277177\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1st International Conference on Information Management and Management Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3277139.3277177","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在众包项目中,将任务分配给工人是具有挑战性的,需要考虑工人的能力、项目持续时间、总成本和一些操作限制。我们将问题表述为三目标优化模型,在考虑承包商能力风险的情况下,最小化项目工期,同时实现更低的总成本和更少的工人。提出了一种求解帕累托有效解的启发式算法。采用模糊层次分析法确定协同制造任务分配过程中时间成本和选择工人数量之间的优先级。最后,设计了求解多目标模型的启发式算法,并通过具体实例验证了算法的有效性和优越性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A task assignment model and its application for crowdsourcing project factored multi-objective and risks
Assigning tasks to workers for a crowdsourcing project is challenging and needs to consider worker capacity, project duration, total cost and some operational constraints. We formulate the problem as a tri-objective optimisation model, which minimises project duration while simultaneously achieving lower total cost and fewer workers under the considering the capacity risk of contractor. A heuristic algorithm is developed to obtain Pareto efficient solutions. we used the fuzzy AHP(analytic hierarchy process) to confirm the priority among the time cost and the number of selected workers in the process of collaborative manufacturing task allocation. Finally, we designed the heuristic algorithm to solve the multi- objectives model and verified the validity superiority of the algorithm through a specific example.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信