Jibrin Sule, Miiraj Abdulmumin, Abdukadir Sabo Osu
{"title":"专家对FCT废弃建筑项目的看法-尼日利亚阿布贾","authors":"Jibrin Sule, Miiraj Abdulmumin, Abdukadir Sabo Osu","doi":"10.11648/j.jccee.20230803.11","DOIUrl":null,"url":null,"abstract":": This research aimed at investigating the causes and effects of abandoned building construction project in Abuja Municipal Area Councils (AMAC) of FCT, Nigeria so as to proffer solution to the problem(s). This research uses a qualitative method of research in which a structured close ended questionnaire was prepared to capture information on the causes and effects of abandoned building construction projects in AMAC. It was on this basis that a structured questionnaire with Likert Scale design method was adopted. One hundred and ten (110) consultants obtained from professional bodies like Council for Regulation of Engineering (COREN), Council of Registered Builders of Nigeria (CORBON), Architect Registration Council of Nigeria (ARCON), Quantity Surveyors Registration Board of Nigeria (QSRBN) and Procurement Consultants were contacted to get their views on abandonment of building construction project. Eighty-Eight (88) responses were obtained to give a return rate of 80%. All information found were analysed using the Relative Importance Index (R.I.I) formula. The higher the Relative Importance Index value, the more significant is the cause or effect of abandoning building project. Sixteen (16) important causes of abandoning building construction project and nine (9) main effect of abandoning building construction project were identified. This research therefore concluded that if the causes and effects of abandoning building construction projects are corrected through the application of numerous recommendations made on this research, building construction project abandonment will be history in the research area and indeed the country at large.","PeriodicalId":262934,"journal":{"name":"Journal of Civil, Construction and Environmental Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria\",\"authors\":\"Jibrin Sule, Miiraj Abdulmumin, Abdukadir Sabo Osu\",\"doi\":\"10.11648/j.jccee.20230803.11\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": This research aimed at investigating the causes and effects of abandoned building construction project in Abuja Municipal Area Councils (AMAC) of FCT, Nigeria so as to proffer solution to the problem(s). This research uses a qualitative method of research in which a structured close ended questionnaire was prepared to capture information on the causes and effects of abandoned building construction projects in AMAC. It was on this basis that a structured questionnaire with Likert Scale design method was adopted. One hundred and ten (110) consultants obtained from professional bodies like Council for Regulation of Engineering (COREN), Council of Registered Builders of Nigeria (CORBON), Architect Registration Council of Nigeria (ARCON), Quantity Surveyors Registration Board of Nigeria (QSRBN) and Procurement Consultants were contacted to get their views on abandonment of building construction project. Eighty-Eight (88) responses were obtained to give a return rate of 80%. All information found were analysed using the Relative Importance Index (R.I.I) formula. The higher the Relative Importance Index value, the more significant is the cause or effect of abandoning building project. Sixteen (16) important causes of abandoning building construction project and nine (9) main effect of abandoning building construction project were identified. This research therefore concluded that if the causes and effects of abandoning building construction projects are corrected through the application of numerous recommendations made on this research, building construction project abandonment will be history in the research area and indeed the country at large.\",\"PeriodicalId\":262934,\"journal\":{\"name\":\"Journal of Civil, Construction and Environmental Engineering\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Civil, Construction and Environmental Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11648/j.jccee.20230803.11\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil, Construction and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/j.jccee.20230803.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria
: This research aimed at investigating the causes and effects of abandoned building construction project in Abuja Municipal Area Councils (AMAC) of FCT, Nigeria so as to proffer solution to the problem(s). This research uses a qualitative method of research in which a structured close ended questionnaire was prepared to capture information on the causes and effects of abandoned building construction projects in AMAC. It was on this basis that a structured questionnaire with Likert Scale design method was adopted. One hundred and ten (110) consultants obtained from professional bodies like Council for Regulation of Engineering (COREN), Council of Registered Builders of Nigeria (CORBON), Architect Registration Council of Nigeria (ARCON), Quantity Surveyors Registration Board of Nigeria (QSRBN) and Procurement Consultants were contacted to get their views on abandonment of building construction project. Eighty-Eight (88) responses were obtained to give a return rate of 80%. All information found were analysed using the Relative Importance Index (R.I.I) formula. The higher the Relative Importance Index value, the more significant is the cause or effect of abandoning building project. Sixteen (16) important causes of abandoning building construction project and nine (9) main effect of abandoning building construction project were identified. This research therefore concluded that if the causes and effects of abandoning building construction projects are corrected through the application of numerous recommendations made on this research, building construction project abandonment will be history in the research area and indeed the country at large.