{"title":"卡迪夫电话交换机-总能源项目","authors":"I. G. White","doi":"10.1109/INTLEC.1979.4793628","DOIUrl":null,"url":null,"abstract":"The paper covers the basic factors which were taken into account when considering the installation of a Total Energy System in a major communications centre. It also describes the main components of the plant which is currently being commissioned ready for service. Tentative conclusions are given suggesting some limitations to the more widespread use of Total Energy Systems in telecommunications buildings.","PeriodicalId":177302,"journal":{"name":"INTELEC - 1979 International Telecommunications Energy Conference","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Cardiff Telephone Exchange - Total Energy Project\",\"authors\":\"I. G. White\",\"doi\":\"10.1109/INTLEC.1979.4793628\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper covers the basic factors which were taken into account when considering the installation of a Total Energy System in a major communications centre. It also describes the main components of the plant which is currently being commissioned ready for service. Tentative conclusions are given suggesting some limitations to the more widespread use of Total Energy Systems in telecommunications buildings.\",\"PeriodicalId\":177302,\"journal\":{\"name\":\"INTELEC - 1979 International Telecommunications Energy Conference\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTELEC - 1979 International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1979.4793628\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC - 1979 International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1979.4793628","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The paper covers the basic factors which were taken into account when considering the installation of a Total Energy System in a major communications centre. It also describes the main components of the plant which is currently being commissioned ready for service. Tentative conclusions are given suggesting some limitations to the more widespread use of Total Energy Systems in telecommunications buildings.