国家能源控制系统实施及现场经验

B. Barazesh, A. Vidigal, H. Oliveira, O.G. Lobo, P. Roldao, J.P. Sucena Paiva, L. Barruncho, J. Giri
{"title":"国家能源控制系统实施及现场经验","authors":"B. Barazesh, A. Vidigal, H. Oliveira, O.G. Lobo, P. Roldao, J.P. Sucena Paiva, L. Barruncho, J. Giri","doi":"10.1109/PICA.1989.39030","DOIUrl":null,"url":null,"abstract":"A description is given of the National Control System of Electricidade de Portugal, a two-tier scheme which comprises nine control centers and 60 remote terminal units. This system became operational in 1988. Experience in the energy management system industry shows that projects of this nature have certain requirements in several areas for a smooth completion. These areas include specification of the system, design and application of the purchased product, and the procurement of the system. The authors review the way in which these requirements were addressed in the National Control System Project. Further, the potential areas for functional expansion of the system, the associated technology, and the ease of expansion due to the open nature of the system are discussed.<<ETX>>","PeriodicalId":371044,"journal":{"name":"Conference Papers Power Industry Computer Application Conference","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Implementation and field experience of a national energy control system\",\"authors\":\"B. Barazesh, A. Vidigal, H. Oliveira, O.G. Lobo, P. Roldao, J.P. Sucena Paiva, L. Barruncho, J. Giri\",\"doi\":\"10.1109/PICA.1989.39030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A description is given of the National Control System of Electricidade de Portugal, a two-tier scheme which comprises nine control centers and 60 remote terminal units. This system became operational in 1988. Experience in the energy management system industry shows that projects of this nature have certain requirements in several areas for a smooth completion. These areas include specification of the system, design and application of the purchased product, and the procurement of the system. The authors review the way in which these requirements were addressed in the National Control System Project. Further, the potential areas for functional expansion of the system, the associated technology, and the ease of expansion due to the open nature of the system are discussed.<<ETX>>\",\"PeriodicalId\":371044,\"journal\":{\"name\":\"Conference Papers Power Industry Computer Application Conference\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Papers Power Industry Computer Application Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICA.1989.39030\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Papers Power Industry Computer Application Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1989.39030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

介绍了葡萄牙电力国家控制系统,该系统是由9个控制中心和60个远程终端单元组成的两层方案。这个系统在1988年开始运作。能源管理系统行业的经验表明,这种性质的项目在几个方面都有一定的要求,才能顺利完成。这些领域包括系统的规格,所购买产品的设计和应用,以及系统的采购。作者回顾了在国家控制系统项目中处理这些要求的方式。此外,还讨论了系统功能扩展的潜在领域、相关技术以及由于系统的开放性而易于扩展的问题
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Implementation and field experience of a national energy control system
A description is given of the National Control System of Electricidade de Portugal, a two-tier scheme which comprises nine control centers and 60 remote terminal units. This system became operational in 1988. Experience in the energy management system industry shows that projects of this nature have certain requirements in several areas for a smooth completion. These areas include specification of the system, design and application of the purchased product, and the procurement of the system. The authors review the way in which these requirements were addressed in the National Control System Project. Further, the potential areas for functional expansion of the system, the associated technology, and the ease of expansion due to the open nature of the system are discussed.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信