基于关键绩效指标的中小型造船厂生产能力评价

Umran Bilen, Sebnem Helvacioglu, I. H. Helvacioglu
{"title":"基于关键绩效指标的中小型造船厂生产能力评价","authors":"Umran Bilen, Sebnem Helvacioglu, I. H. Helvacioglu","doi":"10.5957/smc-2022-120","DOIUrl":null,"url":null,"abstract":"The current work aims to evaluate productivity and producibility with Key Performance Indicators (KPIs) for Small and Medium Sized Shipyards (SMSS). A systematic approach has been developed by adopting data analysis. Most SMSSs have not implemented data analysis as these are very costly issues. On the other hand, neither the available data nor new technologies will not make any difference without a systematic approach. The proposed methodology is applied to a real case to validate that it is not only a concept study for a problem definition but also a reasonable solution to a known problem by incorporating engineering and business knowledge. The KPIs for cost and producibility evaluation were formulated in a mathematical model upon historical data analysis and are included in this study.","PeriodicalId":336268,"journal":{"name":"Day 2 Wed, September 28, 2022","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of Small and Medium Sized Shipyards Productivity with Key Performance Indicators\",\"authors\":\"Umran Bilen, Sebnem Helvacioglu, I. H. Helvacioglu\",\"doi\":\"10.5957/smc-2022-120\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The current work aims to evaluate productivity and producibility with Key Performance Indicators (KPIs) for Small and Medium Sized Shipyards (SMSS). A systematic approach has been developed by adopting data analysis. Most SMSSs have not implemented data analysis as these are very costly issues. On the other hand, neither the available data nor new technologies will not make any difference without a systematic approach. The proposed methodology is applied to a real case to validate that it is not only a concept study for a problem definition but also a reasonable solution to a known problem by incorporating engineering and business knowledge. The KPIs for cost and producibility evaluation were formulated in a mathematical model upon historical data analysis and are included in this study.\",\"PeriodicalId\":336268,\"journal\":{\"name\":\"Day 2 Wed, September 28, 2022\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, September 28, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5957/smc-2022-120\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 28, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5957/smc-2022-120","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前的工作旨在评估中小型造船厂(SMSS)的关键绩效指标(kpi)的生产率和可生产性。采用数据分析,形成了系统的方法。大多数短信服务都没有实现数据分析,因为这是非常昂贵的问题。另一方面,如果没有系统的方法,现有的数据和新技术都不会产生任何影响。将提出的方法应用于一个实际案例,以验证它不仅是对问题定义的概念研究,而且是通过结合工程和商业知识对已知问题的合理解决方案。成本和产能评价的关键绩效指标是在历史数据分析的基础上建立的数学模型,并纳入本研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation of Small and Medium Sized Shipyards Productivity with Key Performance Indicators
The current work aims to evaluate productivity and producibility with Key Performance Indicators (KPIs) for Small and Medium Sized Shipyards (SMSS). A systematic approach has been developed by adopting data analysis. Most SMSSs have not implemented data analysis as these are very costly issues. On the other hand, neither the available data nor new technologies will not make any difference without a systematic approach. The proposed methodology is applied to a real case to validate that it is not only a concept study for a problem definition but also a reasonable solution to a known problem by incorporating engineering and business knowledge. The KPIs for cost and producibility evaluation were formulated in a mathematical model upon historical data analysis and are included in this study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信