一种新的发电模式,改变了电网扩容和潮流网络的方向

A. H. Khan, A. S. Shamsul Arefin, Maidul Islam, A. Islam
{"title":"一种新的发电模式,改变了电网扩容和潮流网络的方向","authors":"A. H. Khan, A. S. Shamsul Arefin, Maidul Islam, A. Islam","doi":"10.1109/ICGET.2015.7315120","DOIUrl":null,"url":null,"abstract":"The aim of this paper is to explore a new model of electricity generation with a different topology of grid expansion and different direction of power flow network as well as higher penetration rate of renewable energy. Conventional system to generate electricity is to generate large amount electricity which reaches to the consumer end through long transmission line and distribution systems. The expansion of grid follows “generation, transmission, distribution and consumer” network. Expansion of grid nearby the existing one is not so difficult. However, it needs longer time to reach electricity to a residency of remote area because of higher cost associated with long transmission and distribution line. Unavailability of electricity is one of the most important reasons to deprive the population of remote area. It is possible to confirm electricity to the citizens of a remote area by producing small scale electricity at or nearby the consuming spot instead of bearing it through long transmission and distribution lines. Interconnection of multiple small scale generation units may form a different network in comparison to traditional power flow network. A novel method to achieve this has been discussed in this paper. The analyses have been done mainly based on the condition, environment, data and other factors of Bangladesh. This work is not to replace the traditional grid expansion topology rather to assist it with an alternative way.","PeriodicalId":404901,"journal":{"name":"2015 3rd International Conference on Green Energy and Technology (ICGET)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A novel model of electricity generation to change the direction of grid expansion and power flow network\",\"authors\":\"A. H. Khan, A. S. Shamsul Arefin, Maidul Islam, A. Islam\",\"doi\":\"10.1109/ICGET.2015.7315120\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of this paper is to explore a new model of electricity generation with a different topology of grid expansion and different direction of power flow network as well as higher penetration rate of renewable energy. Conventional system to generate electricity is to generate large amount electricity which reaches to the consumer end through long transmission line and distribution systems. The expansion of grid follows “generation, transmission, distribution and consumer” network. Expansion of grid nearby the existing one is not so difficult. However, it needs longer time to reach electricity to a residency of remote area because of higher cost associated with long transmission and distribution line. Unavailability of electricity is one of the most important reasons to deprive the population of remote area. It is possible to confirm electricity to the citizens of a remote area by producing small scale electricity at or nearby the consuming spot instead of bearing it through long transmission and distribution lines. Interconnection of multiple small scale generation units may form a different network in comparison to traditional power flow network. A novel method to achieve this has been discussed in this paper. The analyses have been done mainly based on the condition, environment, data and other factors of Bangladesh. This work is not to replace the traditional grid expansion topology rather to assist it with an alternative way.\",\"PeriodicalId\":404901,\"journal\":{\"name\":\"2015 3rd International Conference on Green Energy and Technology (ICGET)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 3rd International Conference on Green Energy and Technology (ICGET)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICGET.2015.7315120\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 3rd International Conference on Green Energy and Technology (ICGET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICGET.2015.7315120","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的目的是探索一种新的发电模式,具有不同的电网扩展拓扑和不同的潮流网络方向,以及更高的可再生能源渗透率。传统的发电系统是通过长输电线路和配电系统产生大量的电力到达用户端。电网的扩展遵循“发电、输电、配电和消费”网络。在现有电网附近扩建电网并不困难。然而,由于输配电线路较长,成本较高,将电力输送到偏远地区的居民需要较长的时间。无电是偏远地区人口贫困的重要原因之一。在用电点或附近生产小规模电力,而不是通过长长的输配电线路输送电力,就可以向偏远地区的居民确认电力。多个小型发电机组的互联可以形成与传统潮流网不同的网络。本文讨论了一种实现这一目标的新方法。分析主要基于孟加拉国的条件、环境、数据和其他因素。这项工作不是要取代传统的网格扩展拓扑,而是用一种替代方法来辅助它。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A novel model of electricity generation to change the direction of grid expansion and power flow network
The aim of this paper is to explore a new model of electricity generation with a different topology of grid expansion and different direction of power flow network as well as higher penetration rate of renewable energy. Conventional system to generate electricity is to generate large amount electricity which reaches to the consumer end through long transmission line and distribution systems. The expansion of grid follows “generation, transmission, distribution and consumer” network. Expansion of grid nearby the existing one is not so difficult. However, it needs longer time to reach electricity to a residency of remote area because of higher cost associated with long transmission and distribution line. Unavailability of electricity is one of the most important reasons to deprive the population of remote area. It is possible to confirm electricity to the citizens of a remote area by producing small scale electricity at or nearby the consuming spot instead of bearing it through long transmission and distribution lines. Interconnection of multiple small scale generation units may form a different network in comparison to traditional power flow network. A novel method to achieve this has been discussed in this paper. The analyses have been done mainly based on the condition, environment, data and other factors of Bangladesh. This work is not to replace the traditional grid expansion topology rather to assist it with an alternative way.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信