{"title":"安排软件项目,以在给定的人员下最小化开发时间和成本","authors":"F. Padberg","doi":"10.1109/APSEC.2001.991476","DOIUrl":null,"url":null,"abstract":"A probabilistic scheduling model for software projects is presented. The model explicitly takes a scheduling strategy as input. When the scheduling strategy is fired, the model outputs a probability distribution for the project completion time or cost. By applying stochastic optimization techniques, schedules for software projects can be computed which minimize the development time or cost with a given staff.","PeriodicalId":130293,"journal":{"name":"Proceedings Eighth Asia-Pacific Software Engineering Conference","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":"{\"title\":\"Scheduling software projects to minimize the development time and cost with a given staff\",\"authors\":\"F. Padberg\",\"doi\":\"10.1109/APSEC.2001.991476\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A probabilistic scheduling model for software projects is presented. The model explicitly takes a scheduling strategy as input. When the scheduling strategy is fired, the model outputs a probability distribution for the project completion time or cost. By applying stochastic optimization techniques, schedules for software projects can be computed which minimize the development time or cost with a given staff.\",\"PeriodicalId\":130293,\"journal\":{\"name\":\"Proceedings Eighth Asia-Pacific Software Engineering Conference\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"25\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Eighth Asia-Pacific Software Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APSEC.2001.991476\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Eighth Asia-Pacific Software Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2001.991476","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scheduling software projects to minimize the development time and cost with a given staff
A probabilistic scheduling model for software projects is presented. The model explicitly takes a scheduling strategy as input. When the scheduling strategy is fired, the model outputs a probability distribution for the project completion time or cost. By applying stochastic optimization techniques, schedules for software projects can be computed which minimize the development time or cost with a given staff.