基于DQFM方法考虑多事件组合的PRA程序研究

H. Yamakawa, H. Muta
{"title":"基于DQFM方法考虑多事件组合的PRA程序研究","authors":"H. Yamakawa, H. Muta","doi":"10.1115/ICONE26-82086","DOIUrl":null,"url":null,"abstract":"Fukushima Daiichi Nuclear Power Station accident occurred by the Great East Japan Earthquake on March 11, 2011. After that, continuous enhancement of nuclear safety is being required in Japan. The accident of Fukushima was caused by the seismic induced tsunami event, namely, multiple events. The other examples of multiple events due to the seismic event are such as internal fire and internal flooding in the nuclear power plants. In addition, structures, such as a building, and piping might be damaged by the seismic event, which could impact component failure dependently. In order to consider these kinds of events, the development of PRA procedures for multiple events caused by the seismic events will be highly demanded. So, we developed a basic PRA methodology for seismic induced tsunami events using “Direct Quantification of Fault Tree using Monte Carlo simulation (DQFM) methodology”. And we verified its applicability through the evaluation.","PeriodicalId":237355,"journal":{"name":"Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Study on PRA Procedure Considering Combination of Multiple Events Using DQFM Methodology\",\"authors\":\"H. Yamakawa, H. Muta\",\"doi\":\"10.1115/ICONE26-82086\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Fukushima Daiichi Nuclear Power Station accident occurred by the Great East Japan Earthquake on March 11, 2011. After that, continuous enhancement of nuclear safety is being required in Japan. The accident of Fukushima was caused by the seismic induced tsunami event, namely, multiple events. The other examples of multiple events due to the seismic event are such as internal fire and internal flooding in the nuclear power plants. In addition, structures, such as a building, and piping might be damaged by the seismic event, which could impact component failure dependently. In order to consider these kinds of events, the development of PRA procedures for multiple events caused by the seismic events will be highly demanded. So, we developed a basic PRA methodology for seismic induced tsunami events using “Direct Quantification of Fault Tree using Monte Carlo simulation (DQFM) methodology”. And we verified its applicability through the evaluation.\",\"PeriodicalId\":237355,\"journal\":{\"name\":\"Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/ICONE26-82086\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ICONE26-82086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

福岛第一核电站事故发生在2011年3月11日东日本大地震中。此后,日本需要不断加强核安全。福岛事故是由地震引发的海啸事件引起的,即多重事件。其他由地震事件引起的多重事件的例子是核电站的内部火灾和内部洪水。此外,建筑物和管道等结构可能会受到地震事件的破坏,这可能会对部件的失效产生不同的影响。为了考虑这类事件,迫切需要开发地震事件引起的多事件PRA程序。因此,我们使用“使用蒙特卡罗模拟(DQFM)方法直接量化故障树”开发了地震诱发海啸事件的基本PRA方法。并通过评价验证了其适用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on PRA Procedure Considering Combination of Multiple Events Using DQFM Methodology
Fukushima Daiichi Nuclear Power Station accident occurred by the Great East Japan Earthquake on March 11, 2011. After that, continuous enhancement of nuclear safety is being required in Japan. The accident of Fukushima was caused by the seismic induced tsunami event, namely, multiple events. The other examples of multiple events due to the seismic event are such as internal fire and internal flooding in the nuclear power plants. In addition, structures, such as a building, and piping might be damaged by the seismic event, which could impact component failure dependently. In order to consider these kinds of events, the development of PRA procedures for multiple events caused by the seismic events will be highly demanded. So, we developed a basic PRA methodology for seismic induced tsunami events using “Direct Quantification of Fault Tree using Monte Carlo simulation (DQFM) methodology”. And we verified its applicability through the evaluation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信