{"title":"开发人员参与和工作量评估的经验","authors":"Ekrem Kocaguneli, Ayse Tosun Misirli, Bora Caglayan, A. Bener","doi":"10.1109/SEAA.2011.71","DOIUrl":null,"url":null,"abstract":"Software effort estimation is critical for resource allocation and planning. Accurate estimates enable managers to distribute the workload among resources in a balanced manner. The actual workload of developers may be different from the values observed in project management tools. In this research, we provide a summary of our experiences regarding: a) effort estimation activities, b) the developer workload distribution through churn data and c) a method of using churn data to track estimation process. Our experience report depends on our collaborative work with our industry partners operating in various domains in Turkey. As a result, we observe that effort estimation is taken as an important topic. However, there is a large space for research to transfer the ad-hoc methods employed in industry to empirical ones. Interestingly, we observe that resource allocations based on initial estimates/plans do not conform to actual values. The common characteristic of developer contribution in different projects is: More than 80% of edits in code are performed by a small number of developers.","PeriodicalId":107972,"journal":{"name":"2011 37th EUROMICRO Conference on Software Engineering and Advanced Applications","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"15","resultStr":"{\"title\":\"Experiences on Developer Participation and Effort Estimation\",\"authors\":\"Ekrem Kocaguneli, Ayse Tosun Misirli, Bora Caglayan, A. Bener\",\"doi\":\"10.1109/SEAA.2011.71\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Software effort estimation is critical for resource allocation and planning. Accurate estimates enable managers to distribute the workload among resources in a balanced manner. The actual workload of developers may be different from the values observed in project management tools. In this research, we provide a summary of our experiences regarding: a) effort estimation activities, b) the developer workload distribution through churn data and c) a method of using churn data to track estimation process. Our experience report depends on our collaborative work with our industry partners operating in various domains in Turkey. As a result, we observe that effort estimation is taken as an important topic. However, there is a large space for research to transfer the ad-hoc methods employed in industry to empirical ones. Interestingly, we observe that resource allocations based on initial estimates/plans do not conform to actual values. The common characteristic of developer contribution in different projects is: More than 80% of edits in code are performed by a small number of developers.\",\"PeriodicalId\":107972,\"journal\":{\"name\":\"2011 37th EUROMICRO Conference on Software Engineering and Advanced Applications\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"15\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 37th EUROMICRO Conference on Software Engineering and Advanced Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SEAA.2011.71\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 37th EUROMICRO Conference on Software Engineering and Advanced Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SEAA.2011.71","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Experiences on Developer Participation and Effort Estimation
Software effort estimation is critical for resource allocation and planning. Accurate estimates enable managers to distribute the workload among resources in a balanced manner. The actual workload of developers may be different from the values observed in project management tools. In this research, we provide a summary of our experiences regarding: a) effort estimation activities, b) the developer workload distribution through churn data and c) a method of using churn data to track estimation process. Our experience report depends on our collaborative work with our industry partners operating in various domains in Turkey. As a result, we observe that effort estimation is taken as an important topic. However, there is a large space for research to transfer the ad-hoc methods employed in industry to empirical ones. Interestingly, we observe that resource allocations based on initial estimates/plans do not conform to actual values. The common characteristic of developer contribution in different projects is: More than 80% of edits in code are performed by a small number of developers.