{"title":"费米实验室的设备和实验","authors":"P. Koehler","doi":"10.1063/1.34876","DOIUrl":null,"url":null,"abstract":"This paper describes the presently existing accelerator and research facilities at Fermilab as well as those currently being constructed. This is followed by a brief overview of the approved experiments for both the colliding beams mode and the fixed target mode of operation.","PeriodicalId":240164,"journal":{"name":"Intersections Between Particles and Nuclear Physics","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Facilities and experiments at Fermilab\",\"authors\":\"P. Koehler\",\"doi\":\"10.1063/1.34876\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the presently existing accelerator and research facilities at Fermilab as well as those currently being constructed. This is followed by a brief overview of the approved experiments for both the colliding beams mode and the fixed target mode of operation.\",\"PeriodicalId\":240164,\"journal\":{\"name\":\"Intersections Between Particles and Nuclear Physics\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-05-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Intersections Between Particles and Nuclear Physics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1063/1.34876\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Intersections Between Particles and Nuclear Physics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.34876","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper describes the presently existing accelerator and research facilities at Fermilab as well as those currently being constructed. This is followed by a brief overview of the approved experiments for both the colliding beams mode and the fixed target mode of operation.