{"title":"多项目生产-库存系统中短期计划延迟的影响","authors":"Henri Tokola, E. Niemi","doi":"10.1109/ISAM.2011.5942310","DOIUrl":null,"url":null,"abstract":"This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.","PeriodicalId":273573,"journal":{"name":"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)","volume":"281 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The effect of short-term planning delays in multi-item production-inventory systems\",\"authors\":\"Henri Tokola, E. Niemi\",\"doi\":\"10.1109/ISAM.2011.5942310\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.\",\"PeriodicalId\":273573,\"journal\":{\"name\":\"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)\",\"volume\":\"281 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISAM.2011.5942310\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISAM.2011.5942310","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文研究了多项目生产库存系统中的短期生产计划问题。在短期计划中,我们研究由固定的时间表和计划间隔引起的延迟。我们考虑三个不同的系统,分别是加工分包商、电机公司和装配厂。每一种都有自己的特点。分包商有几次因安装而造成的批次延迟,电机公司定期出货,装配厂生产时间长,成品出货时间长。我们研究这些特征如何影响他们的短期生产计划。仿真结果表明,电机公司如何从没有任何延迟的规划中获得最明显的优势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The effect of short-term planning delays in multi-item production-inventory systems
This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信