{"title":"多项目生产-库存系统中短期计划延迟的影响","authors":"Henri Tokola, E. Niemi","doi":"10.1109/ISAM.2011.5942310","DOIUrl":null,"url":null,"abstract":"This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.","PeriodicalId":273573,"journal":{"name":"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)","volume":"281 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The effect of short-term planning delays in multi-item production-inventory systems\",\"authors\":\"Henri Tokola, E. Niemi\",\"doi\":\"10.1109/ISAM.2011.5942310\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.\",\"PeriodicalId\":273573,\"journal\":{\"name\":\"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)\",\"volume\":\"281 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISAM.2011.5942310\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE International Symposium on Assembly and Manufacturing (ISAM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISAM.2011.5942310","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The effect of short-term planning delays in multi-item production-inventory systems
This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.