在一个时间紧迫的世界中整合的材料资源计划/调度

G. Bennett, D. Ries
{"title":"在一个时间紧迫的世界中整合的材料资源计划/调度","authors":"G. Bennett, D. Ries","doi":"10.1109/DKSME.1989.107458","DOIUrl":null,"url":null,"abstract":"Summary form only given. Advanced systems are based on a model of the factory that schedules (and continually reschedules) the use of material, machines and people resources to demands and orders placed on the factory. Rule-based systems are used to route orders to processes in the factory, to select material based on current inventory levels and processing alternative, and to select workstations and staff pools for the processes. The integrated materials resources planning is tied to actual factory capacities. This integration insures that the material is available when it can be needed and when it can be used. The advantage over other systems is that standard MRP2 approaches sometimes require raw material to be purchased too early based on standard lead-times; in other cases the standard MRP2 systems can result in later delivery of products.<<ETX>>","PeriodicalId":228213,"journal":{"name":"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated material resource planning/scheduling in a time-compressed world\",\"authors\":\"G. Bennett, D. Ries\",\"doi\":\"10.1109/DKSME.1989.107458\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary form only given. Advanced systems are based on a model of the factory that schedules (and continually reschedules) the use of material, machines and people resources to demands and orders placed on the factory. Rule-based systems are used to route orders to processes in the factory, to select material based on current inventory levels and processing alternative, and to select workstations and staff pools for the processes. The integrated materials resources planning is tied to actual factory capacities. This integration insures that the material is available when it can be needed and when it can be used. The advantage over other systems is that standard MRP2 approaches sometimes require raw material to be purchased too early based on standard lead-times; in other cases the standard MRP2 systems can result in later delivery of products.<<ETX>>\",\"PeriodicalId\":228213,\"journal\":{\"name\":\"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DKSME.1989.107458\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DKSME.1989.107458","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

只提供摘要形式。先进的系统是基于工厂的一个模型,该模型根据工厂的需求和订单来安排(并不断地重新安排)材料、机器和人力资源的使用。基于规则的系统用于将订单发送到工厂的流程,根据当前库存水平和处理方案选择材料,以及为流程选择工作站和员工池。综合材料资源计划与工厂的实际生产能力密切相关。这种整合确保了材料在需要的时候和可以使用的时候是可用的。与其他系统相比,其优势在于标准MRP2方法有时需要根据标准交货期太早采购原材料;在其他情况下,标准MRP2系统可能导致产品交付延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated material resource planning/scheduling in a time-compressed world
Summary form only given. Advanced systems are based on a model of the factory that schedules (and continually reschedules) the use of material, machines and people resources to demands and orders placed on the factory. Rule-based systems are used to route orders to processes in the factory, to select material based on current inventory levels and processing alternative, and to select workstations and staff pools for the processes. The integrated materials resources planning is tied to actual factory capacities. This integration insures that the material is available when it can be needed and when it can be used. The advantage over other systems is that standard MRP2 approaches sometimes require raw material to be purchased too early based on standard lead-times; in other cases the standard MRP2 systems can result in later delivery of products.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信