{"title":"Angkasapura II万隆供电自动壁炉楼后备线路设计","authors":"Putri Mariana, Rahmat Hidayat","doi":"10.21070/jeeeu.v6i1.1410","DOIUrl":null,"url":null,"abstract":"Angkasapura II is a State-Owned Enterprise (BUMN) that serves air traffic travel using airplanes which cannot be separated from the need for electricity. Almost all services use electricity, without exception the PKP-PK Building or the fire fighting building. This is because this building has an integrated fire detector that is connected from every room throughout the Angkasapura II area directly with the PKP-PK Building or the fire department building. The problem is because the PKP-PK power source is still sourced from the TNI AU base and has not been sourced from PT Angkasa Pura II. It is feared that if the main source of PKP-PK electricity is interrupted, there will no longer be a backup power supply in the PKP-PK area. From the results of this study, a backup power supply line for the PKP-PK area was made from Angkasapura II, with this if the main electricity had problems, the area could operate smoothly because it had been backed up by the electricity supply from PLN and the Angkasapura II Genset. .","PeriodicalId":320287,"journal":{"name":"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design the Back-Up Line of Power Supply Automatic Fireplace Building in Angkasapura II Bandung\",\"authors\":\"Putri Mariana, Rahmat Hidayat\",\"doi\":\"10.21070/jeeeu.v6i1.1410\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Angkasapura II is a State-Owned Enterprise (BUMN) that serves air traffic travel using airplanes which cannot be separated from the need for electricity. Almost all services use electricity, without exception the PKP-PK Building or the fire fighting building. This is because this building has an integrated fire detector that is connected from every room throughout the Angkasapura II area directly with the PKP-PK Building or the fire department building. The problem is because the PKP-PK power source is still sourced from the TNI AU base and has not been sourced from PT Angkasa Pura II. It is feared that if the main source of PKP-PK electricity is interrupted, there will no longer be a backup power supply in the PKP-PK area. From the results of this study, a backup power supply line for the PKP-PK area was made from Angkasapura II, with this if the main electricity had problems, the area could operate smoothly because it had been backed up by the electricity supply from PLN and the Angkasapura II Genset. .\",\"PeriodicalId\":320287,\"journal\":{\"name\":\"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21070/jeeeu.v6i1.1410\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21070/jeeeu.v6i1.1410","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Angkasapura II是一家国有企业(BUMN),使用飞机提供空中交通旅行,这与对电力的需求密不可分。几乎所有的服务都用电,PKP-PK大楼和消防大楼也不例外。这是因为这座建筑有一个集成的火灾探测器,从整个Angkasapura II区域的每个房间直接连接到PKP-PK大楼或消防部门大楼。问题是PKP-PK的电源仍然来自TNI AU基地,而不是来自PT Angkasa Pura II。人们担心,如果PKP-PK的主要电力来源中断,PKP-PK地区将不再有备用电源。从本研究的结果来看,Angkasapura II为PKP-PK地区提供了一条备用供电线路,如果主电力出现问题,该地区可以顺利运行,因为它有PLN和Angkasapura II发电机组的电力供应作为备份。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design the Back-Up Line of Power Supply Automatic Fireplace Building in Angkasapura II Bandung
Angkasapura II is a State-Owned Enterprise (BUMN) that serves air traffic travel using airplanes which cannot be separated from the need for electricity. Almost all services use electricity, without exception the PKP-PK Building or the fire fighting building. This is because this building has an integrated fire detector that is connected from every room throughout the Angkasapura II area directly with the PKP-PK Building or the fire department building. The problem is because the PKP-PK power source is still sourced from the TNI AU base and has not been sourced from PT Angkasa Pura II. It is feared that if the main source of PKP-PK electricity is interrupted, there will no longer be a backup power supply in the PKP-PK area. From the results of this study, a backup power supply line for the PKP-PK area was made from Angkasapura II, with this if the main electricity had problems, the area could operate smoothly because it had been backed up by the electricity supply from PLN and the Angkasapura II Genset. .
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信