{"title":"电厂建设项目安全管理评价的模糊神经网络模型","authors":"D. Niu, Yongli Wang, Xiaoyong Ma","doi":"10.1109/APCCAS.2008.4746067","DOIUrl":null,"url":null,"abstract":"Safety management is one of the main components of project management. Regarding to power plant construction, safety management evaluation is useful for the construction unit to find the potential hazard source, do practical precautions and generalize lessons for the future. The purpose of this paper is to establish an evaluation model for safety management evaluation. In this paper, the method of principle component analysis were used to deal with the original indexes, it selects the factors which are important for power plant construction evaluation through the method to pre-process all the influenced factors. Based on the pre-processed method, the fuzzy neural network was adopted to establish an evaluation model and classify the evaluation result. This was a new thought for the fuzzy neural network to be used in safety management evaluation for power plant construction project.","PeriodicalId":344917,"journal":{"name":"APCCAS 2008 - 2008 IEEE Asia Pacific Conference on Circuits and Systems","volume":"51 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Power plant construction project safety management evaluation with fuzzy neural network model\",\"authors\":\"D. Niu, Yongli Wang, Xiaoyong Ma\",\"doi\":\"10.1109/APCCAS.2008.4746067\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Safety management is one of the main components of project management. Regarding to power plant construction, safety management evaluation is useful for the construction unit to find the potential hazard source, do practical precautions and generalize lessons for the future. The purpose of this paper is to establish an evaluation model for safety management evaluation. In this paper, the method of principle component analysis were used to deal with the original indexes, it selects the factors which are important for power plant construction evaluation through the method to pre-process all the influenced factors. Based on the pre-processed method, the fuzzy neural network was adopted to establish an evaluation model and classify the evaluation result. This was a new thought for the fuzzy neural network to be used in safety management evaluation for power plant construction project.\",\"PeriodicalId\":344917,\"journal\":{\"name\":\"APCCAS 2008 - 2008 IEEE Asia Pacific Conference on Circuits and Systems\",\"volume\":\"51 1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"APCCAS 2008 - 2008 IEEE Asia Pacific Conference on Circuits and Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APCCAS.2008.4746067\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"APCCAS 2008 - 2008 IEEE Asia Pacific Conference on Circuits and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APCCAS.2008.4746067","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

安全管理是项目管理的重要组成部分之一。对于电厂建设而言,安全管理评价有助于建设单位发现潜在危险源,采取切实可行的防范措施,为今后的建设总结经验教训。本文的目的是建立安全管理评价的评价模型。本文采用主成分分析法对原有指标进行处理,通过对所有影响因素进行预处理,筛选出对电厂建设评价有重要意义的因素。在预处理方法的基础上,采用模糊神经网络建立评价模型,并对评价结果进行分类。这为模糊神经网络应用于电厂建设项目安全管理评价提供了新的思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Power plant construction project safety management evaluation with fuzzy neural network model
Safety management is one of the main components of project management. Regarding to power plant construction, safety management evaluation is useful for the construction unit to find the potential hazard source, do practical precautions and generalize lessons for the future. The purpose of this paper is to establish an evaluation model for safety management evaluation. In this paper, the method of principle component analysis were used to deal with the original indexes, it selects the factors which are important for power plant construction evaluation through the method to pre-process all the influenced factors. Based on the pre-processed method, the fuzzy neural network was adopted to establish an evaluation model and classify the evaluation result. This was a new thought for the fuzzy neural network to be used in safety management evaluation for power plant construction project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信