Oleg Olender, A. Malyugin, V. Fedotov, A. Korepanov, R. Asmandiyarov, R. Zulkarniev, Roman Studinsky, E. Sayfutdinov, A. A. Ivanov
{"title":"Novoportovskoye油田修井方案的创建","authors":"Oleg Olender, A. Malyugin, V. Fedotov, A. Korepanov, R. Asmandiyarov, R. Zulkarniev, Roman Studinsky, E. Sayfutdinov, A. A. Ivanov","doi":"10.2118/191715-18RPTC-MS","DOIUrl":null,"url":null,"abstract":"\n Novoportovskoye Field is classified as large and is characterized by complex geological structure, reservoir development is complicated by bottom water and gas caps.\n The field is developed by horizontal wells with a horizontal section length of up to 2,000 m and various completion methods: Assemblies with extended screen sections isolated by packersAssemblies with sliding ball-activated hydraulic fracturing collarsInternal-flush assemblies with hydraulic fracturing collars (30pcs) activated by a special CT-conveyed device.\n To estimate the efficiency of multi-stage hydraulic fracturing in horizontal wells, a module has been developed that allows estimating the effect of the primary and repeated fracturing. The module takes into account the increase in the number of frac stages, fracture half-length and width, it allows to estimate the risks of clay barriers breakthrough, evaluate reservoir properties, and select the stimulation option.\n To select wells for Hz sidetracking and infill drilling, an algorithm for identifying undeveloped reservoir sections was applied to evaluate the efficiency of well interventions and assess the risks in each zone.\n In the conditions of oil rims, to increase the efficiency of reservoir development using horizontal wells with screen completions, it is recommended to use casing packers in a liner assembly that divide the horizontal borehole into isolated sections. This solution will allow to perform targeted isolation / stimulation of a certain horizontal interval in the process of well operation in case of a decrease in productivity and water/gas breakthrough. As a result, the cost-effective life of a well will be extended and the oil recovery factor of the field will be increased.\n A twin-packer technology for a targeted stimulation of a certain interval in a horizontal wellbore was tested and successfully implemented by Gazpromneft-Yamal.","PeriodicalId":242965,"journal":{"name":"Day 2 Tue, October 16, 2018","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Well Intervention Program Creation at the Novoportovskoye Field\",\"authors\":\"Oleg Olender, A. Malyugin, V. Fedotov, A. Korepanov, R. Asmandiyarov, R. Zulkarniev, Roman Studinsky, E. Sayfutdinov, A. A. Ivanov\",\"doi\":\"10.2118/191715-18RPTC-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Novoportovskoye Field is classified as large and is characterized by complex geological structure, reservoir development is complicated by bottom water and gas caps.\\n The field is developed by horizontal wells with a horizontal section length of up to 2,000 m and various completion methods: Assemblies with extended screen sections isolated by packersAssemblies with sliding ball-activated hydraulic fracturing collarsInternal-flush assemblies with hydraulic fracturing collars (30pcs) activated by a special CT-conveyed device.\\n To estimate the efficiency of multi-stage hydraulic fracturing in horizontal wells, a module has been developed that allows estimating the effect of the primary and repeated fracturing. The module takes into account the increase in the number of frac stages, fracture half-length and width, it allows to estimate the risks of clay barriers breakthrough, evaluate reservoir properties, and select the stimulation option.\\n To select wells for Hz sidetracking and infill drilling, an algorithm for identifying undeveloped reservoir sections was applied to evaluate the efficiency of well interventions and assess the risks in each zone.\\n In the conditions of oil rims, to increase the efficiency of reservoir development using horizontal wells with screen completions, it is recommended to use casing packers in a liner assembly that divide the horizontal borehole into isolated sections. This solution will allow to perform targeted isolation / stimulation of a certain horizontal interval in the process of well operation in case of a decrease in productivity and water/gas breakthrough. As a result, the cost-effective life of a well will be extended and the oil recovery factor of the field will be increased.\\n A twin-packer technology for a targeted stimulation of a certain interval in a horizontal wellbore was tested and successfully implemented by Gazpromneft-Yamal.\",\"PeriodicalId\":242965,\"journal\":{\"name\":\"Day 2 Tue, October 16, 2018\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 16, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191715-18RPTC-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 16, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191715-18RPTC-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Well Intervention Program Creation at the Novoportovskoye Field
Novoportovskoye Field is classified as large and is characterized by complex geological structure, reservoir development is complicated by bottom water and gas caps.
The field is developed by horizontal wells with a horizontal section length of up to 2,000 m and various completion methods: Assemblies with extended screen sections isolated by packersAssemblies with sliding ball-activated hydraulic fracturing collarsInternal-flush assemblies with hydraulic fracturing collars (30pcs) activated by a special CT-conveyed device.
To estimate the efficiency of multi-stage hydraulic fracturing in horizontal wells, a module has been developed that allows estimating the effect of the primary and repeated fracturing. The module takes into account the increase in the number of frac stages, fracture half-length and width, it allows to estimate the risks of clay barriers breakthrough, evaluate reservoir properties, and select the stimulation option.
To select wells for Hz sidetracking and infill drilling, an algorithm for identifying undeveloped reservoir sections was applied to evaluate the efficiency of well interventions and assess the risks in each zone.
In the conditions of oil rims, to increase the efficiency of reservoir development using horizontal wells with screen completions, it is recommended to use casing packers in a liner assembly that divide the horizontal borehole into isolated sections. This solution will allow to perform targeted isolation / stimulation of a certain horizontal interval in the process of well operation in case of a decrease in productivity and water/gas breakthrough. As a result, the cost-effective life of a well will be extended and the oil recovery factor of the field will be increased.
A twin-packer technology for a targeted stimulation of a certain interval in a horizontal wellbore was tested and successfully implemented by Gazpromneft-Yamal.