Novoportovskoye油田修井方案的创建

Oleg Olender, A. Malyugin, V. Fedotov, A. Korepanov, R. Asmandiyarov, R. Zulkarniev, Roman Studinsky, E. Sayfutdinov, A. A. Ivanov
{"title":"Novoportovskoye油田修井方案的创建","authors":"Oleg Olender, A. Malyugin, V. Fedotov, A. Korepanov, R. Asmandiyarov, R. Zulkarniev, Roman Studinsky, E. Sayfutdinov, A. A. Ivanov","doi":"10.2118/191715-18RPTC-MS","DOIUrl":null,"url":null,"abstract":"\n Novoportovskoye Field is classified as large and is characterized by complex geological structure, reservoir development is complicated by bottom water and gas caps.\n The field is developed by horizontal wells with a horizontal section length of up to 2,000 m and various completion methods: Assemblies with extended screen sections isolated by packersAssemblies with sliding ball-activated hydraulic fracturing collarsInternal-flush assemblies with hydraulic fracturing collars (30pcs) activated by a special CT-conveyed device.\n To estimate the efficiency of multi-stage hydraulic fracturing in horizontal wells, a module has been developed that allows estimating the effect of the primary and repeated fracturing. The module takes into account the increase in the number of frac stages, fracture half-length and width, it allows to estimate the risks of clay barriers breakthrough, evaluate reservoir properties, and select the stimulation option.\n To select wells for Hz sidetracking and infill drilling, an algorithm for identifying undeveloped reservoir sections was applied to evaluate the efficiency of well interventions and assess the risks in each zone.\n In the conditions of oil rims, to increase the efficiency of reservoir development using horizontal wells with screen completions, it is recommended to use casing packers in a liner assembly that divide the horizontal borehole into isolated sections. This solution will allow to perform targeted isolation / stimulation of a certain horizontal interval in the process of well operation in case of a decrease in productivity and water/gas breakthrough. As a result, the cost-effective life of a well will be extended and the oil recovery factor of the field will be increased.\n A twin-packer technology for a targeted stimulation of a certain interval in a horizontal wellbore was tested and successfully implemented by Gazpromneft-Yamal.","PeriodicalId":242965,"journal":{"name":"Day 2 Tue, October 16, 2018","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Well Intervention Program Creation at the Novoportovskoye Field\",\"authors\":\"Oleg Olender, A. Malyugin, V. Fedotov, A. Korepanov, R. Asmandiyarov, R. Zulkarniev, Roman Studinsky, E. Sayfutdinov, A. A. Ivanov\",\"doi\":\"10.2118/191715-18RPTC-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Novoportovskoye Field is classified as large and is characterized by complex geological structure, reservoir development is complicated by bottom water and gas caps.\\n The field is developed by horizontal wells with a horizontal section length of up to 2,000 m and various completion methods: Assemblies with extended screen sections isolated by packersAssemblies with sliding ball-activated hydraulic fracturing collarsInternal-flush assemblies with hydraulic fracturing collars (30pcs) activated by a special CT-conveyed device.\\n To estimate the efficiency of multi-stage hydraulic fracturing in horizontal wells, a module has been developed that allows estimating the effect of the primary and repeated fracturing. The module takes into account the increase in the number of frac stages, fracture half-length and width, it allows to estimate the risks of clay barriers breakthrough, evaluate reservoir properties, and select the stimulation option.\\n To select wells for Hz sidetracking and infill drilling, an algorithm for identifying undeveloped reservoir sections was applied to evaluate the efficiency of well interventions and assess the risks in each zone.\\n In the conditions of oil rims, to increase the efficiency of reservoir development using horizontal wells with screen completions, it is recommended to use casing packers in a liner assembly that divide the horizontal borehole into isolated sections. This solution will allow to perform targeted isolation / stimulation of a certain horizontal interval in the process of well operation in case of a decrease in productivity and water/gas breakthrough. As a result, the cost-effective life of a well will be extended and the oil recovery factor of the field will be increased.\\n A twin-packer technology for a targeted stimulation of a certain interval in a horizontal wellbore was tested and successfully implemented by Gazpromneft-Yamal.\",\"PeriodicalId\":242965,\"journal\":{\"name\":\"Day 2 Tue, October 16, 2018\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 16, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191715-18RPTC-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 16, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191715-18RPTC-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Novoportovskoye油田属于大型油田,地质构造复杂,油藏开发受到底水和气顶的影响。该油田由水平井开发,水平井段长度可达2000米,并采用多种完井方法:采用封隔器隔离的加长筛管组合,采用滑动球激活的水力压裂接箍组合,采用特殊ct传输装置激活的水力压裂接箍内冲式组合(30个)。为了评估水平井多级水力压裂的效率,开发了一个模块,可以评估一次压裂和重复压裂的效果。该模块考虑了压裂段数量、裂缝半长和宽度的增加,可以估计粘土屏障突破的风险,评估储层性质,并选择增产方案。为了选择进行Hz侧钻和填充钻井的井,应用了一种识别未开发油藏段的算法来评估井干预的效率,并评估每个层的风险。在油环条件下,为了提高采用筛管完井的水平井油藏开发效率,建议在尾管组合中使用套管封隔器,将水平井段分隔成隔离段。该解决方案将允许在井运行过程中,在产能下降和水/气突破的情况下,对一定水平段进行有针对性的隔离/增产。从而延长油井的经济寿命,提高油田的采收率。Gazpromneft-Yamal公司对一种双封隔器技术进行了测试,并成功应用于水平井段的定向增产作业。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Well Intervention Program Creation at the Novoportovskoye Field
Novoportovskoye Field is classified as large and is characterized by complex geological structure, reservoir development is complicated by bottom water and gas caps. The field is developed by horizontal wells with a horizontal section length of up to 2,000 m and various completion methods: Assemblies with extended screen sections isolated by packersAssemblies with sliding ball-activated hydraulic fracturing collarsInternal-flush assemblies with hydraulic fracturing collars (30pcs) activated by a special CT-conveyed device. To estimate the efficiency of multi-stage hydraulic fracturing in horizontal wells, a module has been developed that allows estimating the effect of the primary and repeated fracturing. The module takes into account the increase in the number of frac stages, fracture half-length and width, it allows to estimate the risks of clay barriers breakthrough, evaluate reservoir properties, and select the stimulation option. To select wells for Hz sidetracking and infill drilling, an algorithm for identifying undeveloped reservoir sections was applied to evaluate the efficiency of well interventions and assess the risks in each zone. In the conditions of oil rims, to increase the efficiency of reservoir development using horizontal wells with screen completions, it is recommended to use casing packers in a liner assembly that divide the horizontal borehole into isolated sections. This solution will allow to perform targeted isolation / stimulation of a certain horizontal interval in the process of well operation in case of a decrease in productivity and water/gas breakthrough. As a result, the cost-effective life of a well will be extended and the oil recovery factor of the field will be increased. A twin-packer technology for a targeted stimulation of a certain interval in a horizontal wellbore was tested and successfully implemented by Gazpromneft-Yamal.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信