使用BIM数字对象(bdo)自动化建筑制造流程

Y. Al-Saeed, D. Edwards, Stephen Scaysbrook
{"title":"使用BIM数字对象(bdo)自动化建筑制造流程","authors":"Y. Al-Saeed, D. Edwards, Stephen Scaysbrook","doi":"10.1108/ci-12-2019-0141","DOIUrl":null,"url":null,"abstract":"This paper aims to present a novel proof-of-concept framework for implementing building information modeling (BIM) Digital Objects (BDO) to automate construction product manufacturers’ processes and augment lean manufacturing.,A mixed interpretivist and post-positivist epistemological lens is adopted to pursue the proof-of-concept’s development. From an operational perspective, a synthesis of literature using interpretivism provides the foundation for deductive research inquiry implemented within a case study approach. Within the case study, participatory action research (PAR) is implemented to test the proof of concept via three “waterfall” research phases, namely, literature diagnosis and BIM package selection, BDO development and validation and evaluation.,The findings illustrate that a BDO (which represents the digital twin of manufacturing products) can augment and drive automation processes and workflows for construction product manufacturers within a contractor’s supply chain. The developed framework illustrates the benefits of a BDO, by reducing the number of manufacturing processes to effectively eliminate early errors in the model, generates financial savings and reduces material wastage.,This research provides a seminal case study that implements BDO to automate construction product manufacturing processes and demonstrates the utilisation of BDO at an operational (vis-a-vis theoretical) level. Future research is proposed to implement a longitudinal approach to measure and report upon the success (or otherwise) of the proof of concept when implemented on fabrications and shop floor procedures.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-02-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"59","resultStr":"{\"title\":\"Automating construction manufacturing procedures using BIM digital objects (BDOs)\",\"authors\":\"Y. Al-Saeed, D. Edwards, Stephen Scaysbrook\",\"doi\":\"10.1108/ci-12-2019-0141\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper aims to present a novel proof-of-concept framework for implementing building information modeling (BIM) Digital Objects (BDO) to automate construction product manufacturers’ processes and augment lean manufacturing.,A mixed interpretivist and post-positivist epistemological lens is adopted to pursue the proof-of-concept’s development. From an operational perspective, a synthesis of literature using interpretivism provides the foundation for deductive research inquiry implemented within a case study approach. Within the case study, participatory action research (PAR) is implemented to test the proof of concept via three “waterfall” research phases, namely, literature diagnosis and BIM package selection, BDO development and validation and evaluation.,The findings illustrate that a BDO (which represents the digital twin of manufacturing products) can augment and drive automation processes and workflows for construction product manufacturers within a contractor’s supply chain. The developed framework illustrates the benefits of a BDO, by reducing the number of manufacturing processes to effectively eliminate early errors in the model, generates financial savings and reduces material wastage.,This research provides a seminal case study that implements BDO to automate construction product manufacturing processes and demonstrates the utilisation of BDO at an operational (vis-a-vis theoretical) level. Future research is proposed to implement a longitudinal approach to measure and report upon the success (or otherwise) of the proof of concept when implemented on fabrications and shop floor procedures.\",\"PeriodicalId\":221945,\"journal\":{\"name\":\"Construction Innovation: Information, Process, Management\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-02-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"59\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Innovation: Information, Process, Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/ci-12-2019-0141\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-12-2019-0141","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 59

摘要

本文旨在提出一种新的概念验证框架,用于实施建筑信息模型(BIM)数字对象(BDO),以实现建筑产品制造商流程的自动化并增强精益制造。采用一种混合的解释主义和后实证主义认识论视角来追求概念证明的发展。从操作的角度来看,使用解释主义的文献综合为在案例研究方法中实施的演绎研究探究提供了基础。在案例研究中,通过三个“瀑布式”研究阶段,即文献诊断和BIM包选择,BDO开发以及验证和评估,实施参与式行动研究(PAR)来测试概念的证明。研究结果表明,BDO(代表制造产品的数字孪生)可以增强和推动承包商供应链中建筑产品制造商的自动化流程和工作流程。开发的框架说明了BDO的好处,通过减少制造过程的数量来有效地消除模型中的早期错误,产生财务节省并减少材料浪费。本研究提供了一个开创性的案例研究,实现了BDO自动化建筑产品制造过程,并展示了BDO在操作(相对于理论)层面的利用。未来的研究建议采用纵向方法来衡量和报告在制造和车间程序中实施的概念验证的成功(或其他)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Automating construction manufacturing procedures using BIM digital objects (BDOs)
This paper aims to present a novel proof-of-concept framework for implementing building information modeling (BIM) Digital Objects (BDO) to automate construction product manufacturers’ processes and augment lean manufacturing.,A mixed interpretivist and post-positivist epistemological lens is adopted to pursue the proof-of-concept’s development. From an operational perspective, a synthesis of literature using interpretivism provides the foundation for deductive research inquiry implemented within a case study approach. Within the case study, participatory action research (PAR) is implemented to test the proof of concept via three “waterfall” research phases, namely, literature diagnosis and BIM package selection, BDO development and validation and evaluation.,The findings illustrate that a BDO (which represents the digital twin of manufacturing products) can augment and drive automation processes and workflows for construction product manufacturers within a contractor’s supply chain. The developed framework illustrates the benefits of a BDO, by reducing the number of manufacturing processes to effectively eliminate early errors in the model, generates financial savings and reduces material wastage.,This research provides a seminal case study that implements BDO to automate construction product manufacturing processes and demonstrates the utilisation of BDO at an operational (vis-a-vis theoretical) level. Future research is proposed to implement a longitudinal approach to measure and report upon the success (or otherwise) of the proof of concept when implemented on fabrications and shop floor procedures.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信