{"title":"通过累积过程模拟,确定油井射孔爆破作业中射孔管片衬药的挠度,提供最大侵彻深度","authors":"A. R. Mukhutdinov, M. G. Efimov, Z. R. Vakhidova","doi":"10.33285/2782-604x-2023-4(597)-27-33","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":228311,"journal":{"name":"Automation and informatization of the fuel and energy complex","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Determination of the deflection of the perforiator segmental lining charge during perforation-explosive works in oil wells to provide the maximum depth of penetration by cumulation process simulation\",\"authors\":\"A. R. Mukhutdinov, M. G. Efimov, Z. R. Vakhidova\",\"doi\":\"10.33285/2782-604x-2023-4(597)-27-33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":228311,\"journal\":{\"name\":\"Automation and informatization of the fuel and energy complex\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation and informatization of the fuel and energy complex\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33285/2782-604x-2023-4(597)-27-33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation and informatization of the fuel and energy complex","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33285/2782-604x-2023-4(597)-27-33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Determination of the deflection of the perforiator segmental lining charge during perforation-explosive works in oil wells to provide the maximum depth of penetration by cumulation process simulation