{"title":"具有分布式发电的配电网可靠性模型","authors":"Ninghui Guo, Lijun Qin","doi":"10.1109/IHMSC.2013.155","DOIUrl":null,"url":null,"abstract":"Islanding operation may occur under circumstance of connection of distributed generation (DG) into power grid. Therefore, the paper proposes principle and strategy for island partition and builds multi-objective mathematical model which takes maximum loading capacity in the island and minimum switch motion as target function. In accordance to characters of the model. The paper presents two-step method for solution, which is characterized by simplicity, convenience in use effective solution and acceptable for practical engineering. Correctness and effectiveness of the solution method and the model are testified by analysis and calculation on a practical system.","PeriodicalId":222375,"journal":{"name":"2013 5th International Conference on Intelligent Human-Machine Systems and Cybernetics","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reliability Model of Distribution Network with Distributed Generation\",\"authors\":\"Ninghui Guo, Lijun Qin\",\"doi\":\"10.1109/IHMSC.2013.155\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Islanding operation may occur under circumstance of connection of distributed generation (DG) into power grid. Therefore, the paper proposes principle and strategy for island partition and builds multi-objective mathematical model which takes maximum loading capacity in the island and minimum switch motion as target function. In accordance to characters of the model. The paper presents two-step method for solution, which is characterized by simplicity, convenience in use effective solution and acceptable for practical engineering. Correctness and effectiveness of the solution method and the model are testified by analysis and calculation on a practical system.\",\"PeriodicalId\":222375,\"journal\":{\"name\":\"2013 5th International Conference on Intelligent Human-Machine Systems and Cybernetics\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-08-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 5th International Conference on Intelligent Human-Machine Systems and Cybernetics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IHMSC.2013.155\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 5th International Conference on Intelligent Human-Machine Systems and Cybernetics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IHMSC.2013.155","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reliability Model of Distribution Network with Distributed Generation
Islanding operation may occur under circumstance of connection of distributed generation (DG) into power grid. Therefore, the paper proposes principle and strategy for island partition and builds multi-objective mathematical model which takes maximum loading capacity in the island and minimum switch motion as target function. In accordance to characters of the model. The paper presents two-step method for solution, which is characterized by simplicity, convenience in use effective solution and acceptable for practical engineering. Correctness and effectiveness of the solution method and the model are testified by analysis and calculation on a practical system.