埃塞俄比亚亚的斯亚贝巴现有莱格达迪供水方案上水力发电的可行性

Matusal Lamaro Lagebo, A. Mohammed
{"title":"埃塞俄比亚亚的斯亚贝巴现有莱格达迪供水方案上水力发电的可行性","authors":"Matusal Lamaro Lagebo, A. Mohammed","doi":"10.59122/1344ca7","DOIUrl":null,"url":null,"abstract":"Hydropower can be harnessed by installing in-pipe turbines with the reduced cost compared with hydropower dam construction. Legedadi Water Supply Scheme is found in Addis Ababa and is fed by gravity. This research assesses the hydropower potential of the existing large water transmission pipelines in line with their financial viability. The research required the collection of data from pipe flow (for 29 years from the system record) and pipe layout drawings believed to be useful for estimating the power. The available pipe layout drawing was processed to prepare a profile view with the help of AutoCAD CIVIL 3D. From the profile view, the gross heads and length of the pipelines were obtained. The exploitable power and financial viability of the projects were estimated by RET Screen software. The raw water main (DN1200) was discovered to have a head of 12.46 m and to convey up to 1.47 m3/s at 90% exceedance over a length of 550 m. The two treated water mains have a head of 19.15 m with a flow of 1.14 m3/s at 90 % exceedance via DN1200 and 0.29 m3/s at 90% exceedance via DN900 over a length of 18.4 km. The most suitable sites for the installation of turbines were at the inlet of the treatment plant and the Kotebe Terminal Reservoir. The Toshiba Hydro-eKIDS turbine was selected since it might work efficiently with large flow variation.The annual energy output from the raw water main to be obtained was 1,208 Mwh,with an estimated cost of $461,000 and an annual savings or revenue of $75,946. For the treated water mains, 1,193 Mwh (DN1200) and 344 Mwh (DN900) could be extracted with an estimated cost of 414,500$ (DN1200) and 135,900$ (DN900). The annual revenue for treated water mains is 75,068$ (DN1200) and that for DN900 is 18,842$.","PeriodicalId":156282,"journal":{"name":"Ethiopian Journal of Water Science and Technology","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Feasibility of hydropower generation on existing Legedadi water supply scheme, Addis Ababa-Ethiopia\",\"authors\":\"Matusal Lamaro Lagebo, A. Mohammed\",\"doi\":\"10.59122/1344ca7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hydropower can be harnessed by installing in-pipe turbines with the reduced cost compared with hydropower dam construction. Legedadi Water Supply Scheme is found in Addis Ababa and is fed by gravity. This research assesses the hydropower potential of the existing large water transmission pipelines in line with their financial viability. The research required the collection of data from pipe flow (for 29 years from the system record) and pipe layout drawings believed to be useful for estimating the power. The available pipe layout drawing was processed to prepare a profile view with the help of AutoCAD CIVIL 3D. From the profile view, the gross heads and length of the pipelines were obtained. The exploitable power and financial viability of the projects were estimated by RET Screen software. The raw water main (DN1200) was discovered to have a head of 12.46 m and to convey up to 1.47 m3/s at 90% exceedance over a length of 550 m. The two treated water mains have a head of 19.15 m with a flow of 1.14 m3/s at 90 % exceedance via DN1200 and 0.29 m3/s at 90% exceedance via DN900 over a length of 18.4 km. The most suitable sites for the installation of turbines were at the inlet of the treatment plant and the Kotebe Terminal Reservoir. The Toshiba Hydro-eKIDS turbine was selected since it might work efficiently with large flow variation.The annual energy output from the raw water main to be obtained was 1,208 Mwh,with an estimated cost of $461,000 and an annual savings or revenue of $75,946. For the treated water mains, 1,193 Mwh (DN1200) and 344 Mwh (DN900) could be extracted with an estimated cost of 414,500$ (DN1200) and 135,900$ (DN900). The annual revenue for treated water mains is 75,068$ (DN1200) and that for DN900 is 18,842$.\",\"PeriodicalId\":156282,\"journal\":{\"name\":\"Ethiopian Journal of Water Science and Technology\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ethiopian Journal of Water Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59122/1344ca7\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ethiopian Journal of Water Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59122/1344ca7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

水力发电可以通过安装管内水轮机进行利用,与水电站大坝建设相比,成本较低。莱格达迪供水计划位于亚的斯亚贝巴,由重力供水。本研究根据其财务可行性,评估现有大型输水管道的水电潜力。这项研究需要收集管道流量数据(29年来的系统记录)和管道布局图,这些数据被认为对估计功率很有用。利用AutoCAD CIVIL 3D软件对现有的管道布置图进行处理,绘制出剖面图。从剖面图中得到了管道的总扬程和长度。利用RET Screen软件对项目的开发能力和财务可行性进行了评估。发现原水总管(DN1200)的水头为12.46米,在550米的长度上,以超过90%的速度输送高达1.47立方米/秒。两条经处理的自来水总管的水头为19.15米,通过DN1200超过90%时的流量为1.14立方米/秒,通过DN900超过90%时的流量为0.29立方米/秒,全长18.4公里。最适合安装涡轮机的地点是在处理厂的入口和Kotebe终端水库。东芝Hydro-eKIDS涡轮机被选择,因为它可能在大流量变化下有效地工作。从原水管道获得的年发电量为1208兆瓦时,估计成本为461,000美元,每年节省或收入为75,946美元。对于处理后的水管,可以提取1,193兆瓦时(DN1200)和344兆瓦时(DN900),估计成本为414,500美元(DN1200)和135,900美元(DN900)。处理水管的年收入为75,068美元(DN1200), DN900的年收入为18,842美元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Feasibility of hydropower generation on existing Legedadi water supply scheme, Addis Ababa-Ethiopia
Hydropower can be harnessed by installing in-pipe turbines with the reduced cost compared with hydropower dam construction. Legedadi Water Supply Scheme is found in Addis Ababa and is fed by gravity. This research assesses the hydropower potential of the existing large water transmission pipelines in line with their financial viability. The research required the collection of data from pipe flow (for 29 years from the system record) and pipe layout drawings believed to be useful for estimating the power. The available pipe layout drawing was processed to prepare a profile view with the help of AutoCAD CIVIL 3D. From the profile view, the gross heads and length of the pipelines were obtained. The exploitable power and financial viability of the projects were estimated by RET Screen software. The raw water main (DN1200) was discovered to have a head of 12.46 m and to convey up to 1.47 m3/s at 90% exceedance over a length of 550 m. The two treated water mains have a head of 19.15 m with a flow of 1.14 m3/s at 90 % exceedance via DN1200 and 0.29 m3/s at 90% exceedance via DN900 over a length of 18.4 km. The most suitable sites for the installation of turbines were at the inlet of the treatment plant and the Kotebe Terminal Reservoir. The Toshiba Hydro-eKIDS turbine was selected since it might work efficiently with large flow variation.The annual energy output from the raw water main to be obtained was 1,208 Mwh,with an estimated cost of $461,000 and an annual savings or revenue of $75,946. For the treated water mains, 1,193 Mwh (DN1200) and 344 Mwh (DN900) could be extracted with an estimated cost of 414,500$ (DN1200) and 135,900$ (DN900). The annual revenue for treated water mains is 75,068$ (DN1200) and that for DN900 is 18,842$.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信