R. Mueller, R. W. Moses, David Wilson, P. Carrato, Troy King
{"title":"月球大型工程:过程、工作流程和地面建筑行业与太空行业的术语","authors":"R. Mueller, R. W. Moses, David Wilson, P. Carrato, Troy King","doi":"10.1061/9780784483374.109","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":345627,"journal":{"name":"Earth and Space 2021","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Lunar Mega Project: Processes, Work Flow, and Terminology of the Terrestrial Construction Industry versus the Space Industry\",\"authors\":\"R. Mueller, R. W. Moses, David Wilson, P. Carrato, Troy King\",\"doi\":\"10.1061/9780784483374.109\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":345627,\"journal\":{\"name\":\"Earth and Space 2021\",\"volume\":\"63 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Earth and Space 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/9780784483374.109\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Earth and Space 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784483374.109","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}