{"title":"靠近发电机端子的延迟电流零点","authors":"S. Fenske","doi":"10.1109/EEEIC.2010.5489961","DOIUrl":null,"url":null,"abstract":"The paper shows the switching behaviour of a grid circuit breaker in case of short circuits close to generator terminals. For the simulation a new three-phase circuit breaker model has been developed in the network calculation program Power-Factory. PowerFactory is an appropriate software to simulate the switching behaviour of a circuit breaker.","PeriodicalId":197298,"journal":{"name":"2010 9th International Conference on Environment and Electrical Engineering","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Delayed current zeros close to generator terminals\",\"authors\":\"S. Fenske\",\"doi\":\"10.1109/EEEIC.2010.5489961\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper shows the switching behaviour of a grid circuit breaker in case of short circuits close to generator terminals. For the simulation a new three-phase circuit breaker model has been developed in the network calculation program Power-Factory. PowerFactory is an appropriate software to simulate the switching behaviour of a circuit breaker.\",\"PeriodicalId\":197298,\"journal\":{\"name\":\"2010 9th International Conference on Environment and Electrical Engineering\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 9th International Conference on Environment and Electrical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEEIC.2010.5489961\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 9th International Conference on Environment and Electrical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEEIC.2010.5489961","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Delayed current zeros close to generator terminals
The paper shows the switching behaviour of a grid circuit breaker in case of short circuits close to generator terminals. For the simulation a new three-phase circuit breaker model has been developed in the network calculation program Power-Factory. PowerFactory is an appropriate software to simulate the switching behaviour of a circuit breaker.