建筑信息模型(BIM)项目中采购选择的因素

Hamizah Liyana Tajul Ariffin, Kerk Chia Cun, F. M. Raslim, N. Mustaffa
{"title":"建筑信息模型(BIM)项目中采购选择的因素","authors":"Hamizah Liyana Tajul Ariffin, Kerk Chia Cun, F. M. Raslim, N. Mustaffa","doi":"10.1109/ICRIIS.2017.8002464","DOIUrl":null,"url":null,"abstract":"Building Information Modelling (BIM) is a new technology introduced in the construction industry with a positive impact. BIM could increase the efficiency and effectiveness of a project procurement system. Integrated Project Delivery (IPD) is inherits to utilize BIM's potential advantages by the American Institute of Architects. However, a traditional procurement system owned a segregated process. The segregated process might have caused a limitation of project delivery in terms of integration and collaboration of the project team. This research aims to identify the factors affecting the procurement selection in the BIM-based project. The research scoped down for BIM players, who are currently involved in BIM project development. Data was collected through semi-structured interview process. A total of eight respondents were interviewed for the purpose of this research. From the findings, the factors to be taken into consideration in procurement selection such as information factor, risks allocation, cost and time factors, coordination and collaboration. From the research, respondents stated that there is a need to increase the collaboration among the pertinent parties. In a nutshell, the research analysis indicated the information factors are mostly concerning in selecting procurement for BIM project.","PeriodicalId":384130,"journal":{"name":"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Factors concerning procurement selection in Building Information Modelling (BIM) projects\",\"authors\":\"Hamizah Liyana Tajul Ariffin, Kerk Chia Cun, F. M. Raslim, N. Mustaffa\",\"doi\":\"10.1109/ICRIIS.2017.8002464\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building Information Modelling (BIM) is a new technology introduced in the construction industry with a positive impact. BIM could increase the efficiency and effectiveness of a project procurement system. Integrated Project Delivery (IPD) is inherits to utilize BIM's potential advantages by the American Institute of Architects. However, a traditional procurement system owned a segregated process. The segregated process might have caused a limitation of project delivery in terms of integration and collaboration of the project team. This research aims to identify the factors affecting the procurement selection in the BIM-based project. The research scoped down for BIM players, who are currently involved in BIM project development. Data was collected through semi-structured interview process. A total of eight respondents were interviewed for the purpose of this research. From the findings, the factors to be taken into consideration in procurement selection such as information factor, risks allocation, cost and time factors, coordination and collaboration. From the research, respondents stated that there is a need to increase the collaboration among the pertinent parties. In a nutshell, the research analysis indicated the information factors are mostly concerning in selecting procurement for BIM project.\",\"PeriodicalId\":384130,\"journal\":{\"name\":\"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICRIIS.2017.8002464\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Research and Innovation in Information Systems (ICRIIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRIIS.2017.8002464","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑信息模型(BIM)是一项引入建筑业的新技术,具有积极的影响。BIM可以提高项目采购系统的效率和有效性。综合项目交付(Integrated Project Delivery, IPD)是美国建筑师协会(American Institute of Architects)为利用BIM的潜在优势而继承的。然而,传统的采购系统拥有一个分离的过程。就项目团队的集成和协作而言,分离的过程可能会导致项目交付的限制。本研究旨在找出影响bim项目采购选择的因素。该研究将范围缩小到目前参与BIM项目开发的BIM参与者。数据收集采用半结构化访谈法。为了这项研究的目的,总共采访了8名受访者。从调查结果来看,采购选择应考虑的因素有信息因素、风险分配因素、成本和时间因素、协调与协作等。从研究中,受访者表示有必要加强相关各方之间的合作。综上所述,研究分析表明,在BIM项目的采购选择中,信息因素是最受关注的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factors concerning procurement selection in Building Information Modelling (BIM) projects
Building Information Modelling (BIM) is a new technology introduced in the construction industry with a positive impact. BIM could increase the efficiency and effectiveness of a project procurement system. Integrated Project Delivery (IPD) is inherits to utilize BIM's potential advantages by the American Institute of Architects. However, a traditional procurement system owned a segregated process. The segregated process might have caused a limitation of project delivery in terms of integration and collaboration of the project team. This research aims to identify the factors affecting the procurement selection in the BIM-based project. The research scoped down for BIM players, who are currently involved in BIM project development. Data was collected through semi-structured interview process. A total of eight respondents were interviewed for the purpose of this research. From the findings, the factors to be taken into consideration in procurement selection such as information factor, risks allocation, cost and time factors, coordination and collaboration. From the research, respondents stated that there is a need to increase the collaboration among the pertinent parties. In a nutshell, the research analysis indicated the information factors are mostly concerning in selecting procurement for BIM project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信