对意大利调整市场实施匝道税率限制

A. Berizzi, C. Bovo, M. Delfanti, M. Merlo
{"title":"对意大利调整市场实施匝道税率限制","authors":"A. Berizzi, C. Bovo, M. Delfanti, M. Merlo","doi":"10.1109/PCT.2007.4538428","DOIUrl":null,"url":null,"abstract":"In the Italian day-ahead energy market, it is possible to trade the electrical energy without taking into account the technical limits of the generation units (e.g. minimum up time, minimum down time, ramp rate limits). Therefore, the output of the day-ahead energy market may be not feasible for some generating units. In this case, the relevant market operator has to modify the scheduling of the unit through the participation to the adjustment market. This paper presents a model to define the power profile for generating units on the base of the hourly amounts of energy exchanged in the day-ahead energy market, taking into account the technical constraints of generators (ramp rate limits). The proposed model has been tested using data given by a day- ahead energy market simulator, applied to the Italian electric system.","PeriodicalId":356805,"journal":{"name":"2007 IEEE Lausanne Power Tech","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enforcing ramp rate limits on Italian Adjustment Market\",\"authors\":\"A. Berizzi, C. Bovo, M. Delfanti, M. Merlo\",\"doi\":\"10.1109/PCT.2007.4538428\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the Italian day-ahead energy market, it is possible to trade the electrical energy without taking into account the technical limits of the generation units (e.g. minimum up time, minimum down time, ramp rate limits). Therefore, the output of the day-ahead energy market may be not feasible for some generating units. In this case, the relevant market operator has to modify the scheduling of the unit through the participation to the adjustment market. This paper presents a model to define the power profile for generating units on the base of the hourly amounts of energy exchanged in the day-ahead energy market, taking into account the technical constraints of generators (ramp rate limits). The proposed model has been tested using data given by a day- ahead energy market simulator, applied to the Italian electric system.\",\"PeriodicalId\":356805,\"journal\":{\"name\":\"2007 IEEE Lausanne Power Tech\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Lausanne Power Tech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCT.2007.4538428\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Lausanne Power Tech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCT.2007.4538428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在意大利日前能源市场,可以在不考虑发电机组技术限制的情况下进行电能交易(例如,最小启动时间、最小停机时间、斜坡率限制)。因此,日前能源市场的输出对一些发电机组来说可能是不可行的。在这种情况下,相关市场经营者必须通过参与调整市场来修改机组的调度。本文提出了一个模型,在考虑发电机的技术约束(斜坡速率限制)的基础上,根据日前能源市场上每小时的能量交换量来定义发电机组的功率分布。所提出的模型已经用一个提前一天能源市场模拟器给出的数据进行了测试,并应用于意大利电力系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Enforcing ramp rate limits on Italian Adjustment Market
In the Italian day-ahead energy market, it is possible to trade the electrical energy without taking into account the technical limits of the generation units (e.g. minimum up time, minimum down time, ramp rate limits). Therefore, the output of the day-ahead energy market may be not feasible for some generating units. In this case, the relevant market operator has to modify the scheduling of the unit through the participation to the adjustment market. This paper presents a model to define the power profile for generating units on the base of the hourly amounts of energy exchanged in the day-ahead energy market, taking into account the technical constraints of generators (ramp rate limits). The proposed model has been tested using data given by a day- ahead energy market simulator, applied to the Italian electric system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信