基于BIM技术的道路工程土方优化配置模型

Lingfeng Yu
{"title":"基于BIM技术的道路工程土方优化配置模型","authors":"Lingfeng Yu","doi":"10.1145/3548608.3559231","DOIUrl":null,"url":null,"abstract":"Earthwork adjustment plays an important role in the construction of the whole project and the impact on the environment. It is important to formulate earthwork allocation scheme on the basis of accurate earthwork calculation. We use professional equipment to collect the electronic initial topographic map, and then use it to calculate the design elevation to generate the electronic design topographic map. The earthwork volume and centre of gravity, the unit transportation cost, and the earthwork allocation scheme with the minimum transportation cost can be finally calculated. This paper presents a model to establish the optimal allocation model of road engineering earthwork based on BIM Technology, and a case is used to verify the model is economical, scientific and reasonable.","PeriodicalId":201434,"journal":{"name":"Proceedings of the 2022 2nd International Conference on Control and Intelligent Robotics","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Earthwork Optimal Allocation Model of Road Engineering Based on BIM Technology\",\"authors\":\"Lingfeng Yu\",\"doi\":\"10.1145/3548608.3559231\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Earthwork adjustment plays an important role in the construction of the whole project and the impact on the environment. It is important to formulate earthwork allocation scheme on the basis of accurate earthwork calculation. We use professional equipment to collect the electronic initial topographic map, and then use it to calculate the design elevation to generate the electronic design topographic map. The earthwork volume and centre of gravity, the unit transportation cost, and the earthwork allocation scheme with the minimum transportation cost can be finally calculated. This paper presents a model to establish the optimal allocation model of road engineering earthwork based on BIM Technology, and a case is used to verify the model is economical, scientific and reasonable.\",\"PeriodicalId\":201434,\"journal\":{\"name\":\"Proceedings of the 2022 2nd International Conference on Control and Intelligent Robotics\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2022 2nd International Conference on Control and Intelligent Robotics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3548608.3559231\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2022 2nd International Conference on Control and Intelligent Robotics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3548608.3559231","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

土方调整对整个工程的施工和对环境的影响起着重要的作用。在进行准确的土方计算的基础上制定土方分配方案是十分重要的。我们使用专业设备采集电子初始地形图,然后用它计算设计高程生成电子设计地形图。最终计算出土方体积和重心,单位运输成本,以及运输成本最小的土方分配方案。提出了一种基于BIM技术建立道路工程土方优化配置模型的模型,并通过实例验证了该模型的经济性、科学性和合理性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Earthwork Optimal Allocation Model of Road Engineering Based on BIM Technology
Earthwork adjustment plays an important role in the construction of the whole project and the impact on the environment. It is important to formulate earthwork allocation scheme on the basis of accurate earthwork calculation. We use professional equipment to collect the electronic initial topographic map, and then use it to calculate the design elevation to generate the electronic design topographic map. The earthwork volume and centre of gravity, the unit transportation cost, and the earthwork allocation scheme with the minimum transportation cost can be finally calculated. This paper presents a model to establish the optimal allocation model of road engineering earthwork based on BIM Technology, and a case is used to verify the model is economical, scientific and reasonable.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信