{"title":"关于撤销代建政府投资项目管理新模式的通知","authors":"Fan Yuxiang, He Yabo","doi":"10.1109/EDT.2010.5496592","DOIUrl":null,"url":null,"abstract":"The construction management of traditional government investing project has been exposed exactly with disadvantages on the special Chinese conditions and present market environment .so the performing of Agent-construction system model has historic inevitability and practice meaning. Agent-construction system is a new project management model that appears in this years, this paper analyzes the headspring development property and implement of Agent-construction system, putting forward problems and keeping away method which in bringing into effect Agent-construction system at present.","PeriodicalId":325767,"journal":{"name":"2010 International Conference on E-Health Networking Digital Ecosystems and Technologies (EDT)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Notice of RetractionAgent-construction government investment project management new mode\",\"authors\":\"Fan Yuxiang, He Yabo\",\"doi\":\"10.1109/EDT.2010.5496592\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction management of traditional government investing project has been exposed exactly with disadvantages on the special Chinese conditions and present market environment .so the performing of Agent-construction system model has historic inevitability and practice meaning. Agent-construction system is a new project management model that appears in this years, this paper analyzes the headspring development property and implement of Agent-construction system, putting forward problems and keeping away method which in bringing into effect Agent-construction system at present.\",\"PeriodicalId\":325767,\"journal\":{\"name\":\"2010 International Conference on E-Health Networking Digital Ecosystems and Technologies (EDT)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on E-Health Networking Digital Ecosystems and Technologies (EDT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EDT.2010.5496592\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on E-Health Networking Digital Ecosystems and Technologies (EDT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EDT.2010.5496592","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Notice of RetractionAgent-construction government investment project management new mode
The construction management of traditional government investing project has been exposed exactly with disadvantages on the special Chinese conditions and present market environment .so the performing of Agent-construction system model has historic inevitability and practice meaning. Agent-construction system is a new project management model that appears in this years, this paper analyzes the headspring development property and implement of Agent-construction system, putting forward problems and keeping away method which in bringing into effect Agent-construction system at present.