人工神经网络在哈马-叙利亚电厂电力稳定性分析中的应用

A. Alzakkar, Ildar K. Ilyasov, L. Cuong, I. Valeev
{"title":"人工神经网络在哈马-叙利亚电厂电力稳定性分析中的应用","authors":"A. Alzakkar, Ildar K. Ilyasov, L. Cuong, I. Valeev","doi":"10.1109/RusAutoCon52004.2021.9537470","DOIUrl":null,"url":null,"abstract":"The administration of power system has gotten more troublesome than before in light of the fact that power systems are worked nearer as far as possible, ecological requirements limit the development of transmission network, the requirement for significant distance power transfers has increased and less administrators are occupied with the management and activity of power systems. Voltage instability has become a significant worry in many power systems and numerous power outages have been accounted for, where the explanation has been voltage instability. In the current work, the electric voltage stability in Meharde station in Syria has concentrated during the typical and up ordinary loading state. The outcomes in this examination were getting from fake neural network, which is comprising from three layers (input-hidden-output), where this network described by the speed and accuracy in preparing before the failure and cease the providing engine which may prompt practical problems. This investigation has been done through two unique examples of generating in this station (single, double and four) generators. The accomplishment of this network comprises of two phases: preparing Stage (disconnected) and testing Stage (on-line) to make an examination between the preparation stage and testing stage which prompting optimization the load in testing cases relying upon preparing data.","PeriodicalId":106150,"journal":{"name":"2021 International Russian Automation Conference (RusAutoCon)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Impact of Use the Artificial Neural Networks in Analysis of Electrical Power Stability at Meharde Plant (Hama-Syria)\",\"authors\":\"A. Alzakkar, Ildar K. Ilyasov, L. Cuong, I. Valeev\",\"doi\":\"10.1109/RusAutoCon52004.2021.9537470\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The administration of power system has gotten more troublesome than before in light of the fact that power systems are worked nearer as far as possible, ecological requirements limit the development of transmission network, the requirement for significant distance power transfers has increased and less administrators are occupied with the management and activity of power systems. Voltage instability has become a significant worry in many power systems and numerous power outages have been accounted for, where the explanation has been voltage instability. In the current work, the electric voltage stability in Meharde station in Syria has concentrated during the typical and up ordinary loading state. The outcomes in this examination were getting from fake neural network, which is comprising from three layers (input-hidden-output), where this network described by the speed and accuracy in preparing before the failure and cease the providing engine which may prompt practical problems. This investigation has been done through two unique examples of generating in this station (single, double and four) generators. The accomplishment of this network comprises of two phases: preparing Stage (disconnected) and testing Stage (on-line) to make an examination between the preparation stage and testing stage which prompting optimization the load in testing cases relying upon preparing data.\",\"PeriodicalId\":106150,\"journal\":{\"name\":\"2021 International Russian Automation Conference (RusAutoCon)\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Russian Automation Conference (RusAutoCon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RusAutoCon52004.2021.9537470\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Russian Automation Conference (RusAutoCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RusAutoCon52004.2021.9537470","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于电力系统的工作距离越来越近,生态要求限制了输电网络的发展,对远距离输电的要求越来越高,从事电力系统管理和活动的管理人员越来越少,使得电力系统的管理变得比以前更加麻烦。电压不稳定已经成为许多电力系统的一个重大担忧,许多停电已经被解释为电压不稳定。在目前的工作中,叙利亚Meharde电站的电压稳定主要集中在典型和上普通负荷状态。该网络由三层(输入-隐藏-输出)组成,其中该网络描述了故障前准备的速度和准确性,并停止了可能提示实际问题的提供引擎。本研究是通过该站的两个独特的发电实例(单、双、四)来完成的。该网络的完成分为准备阶段(不连接)和测试阶段(在线)两个阶段,在准备阶段和测试阶段之间进行检查,根据准备数据优化测试用例中的负载。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Impact of Use the Artificial Neural Networks in Analysis of Electrical Power Stability at Meharde Plant (Hama-Syria)
The administration of power system has gotten more troublesome than before in light of the fact that power systems are worked nearer as far as possible, ecological requirements limit the development of transmission network, the requirement for significant distance power transfers has increased and less administrators are occupied with the management and activity of power systems. Voltage instability has become a significant worry in many power systems and numerous power outages have been accounted for, where the explanation has been voltage instability. In the current work, the electric voltage stability in Meharde station in Syria has concentrated during the typical and up ordinary loading state. The outcomes in this examination were getting from fake neural network, which is comprising from three layers (input-hidden-output), where this network described by the speed and accuracy in preparing before the failure and cease the providing engine which may prompt practical problems. This investigation has been done through two unique examples of generating in this station (single, double and four) generators. The accomplishment of this network comprises of two phases: preparing Stage (disconnected) and testing Stage (on-line) to make an examination between the preparation stage and testing stage which prompting optimization the load in testing cases relying upon preparing data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信