{"title":"在COVID-19大流行期间实现公共采购","authors":"Zbigniew Mazur","doi":"10.17951/ppa.2020.3.111-121","DOIUrl":null,"url":null,"abstract":"The article deals with the analysis of major changes introduced to the Polish Public Procurement Law for the reason of the outbreak of the COVID-19 pandemic. First of all, the regulation in this area concerns the exclusion of the Public Procurement Law application in respect of necessary procurements. In addition, the legislator has introduced a mutual obligation to communicate about the impact of circumstances relating to the occurrence of COVID-19 on the proper performance of the contract and, as a consequence, the possibility of amending the public procurement contract. The last regulation has introduced solutions to reduce the costs of participation in tender proceedings and to encourage contractors to participate in public tenders.","PeriodicalId":298732,"journal":{"name":"Przegląd Prawa Administracyjnego","volume":"86 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Realisation of Public Procurement during the COVID-19 Pandemic\",\"authors\":\"Zbigniew Mazur\",\"doi\":\"10.17951/ppa.2020.3.111-121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article deals with the analysis of major changes introduced to the Polish Public Procurement Law for the reason of the outbreak of the COVID-19 pandemic. First of all, the regulation in this area concerns the exclusion of the Public Procurement Law application in respect of necessary procurements. In addition, the legislator has introduced a mutual obligation to communicate about the impact of circumstances relating to the occurrence of COVID-19 on the proper performance of the contract and, as a consequence, the possibility of amending the public procurement contract. The last regulation has introduced solutions to reduce the costs of participation in tender proceedings and to encourage contractors to participate in public tenders.\",\"PeriodicalId\":298732,\"journal\":{\"name\":\"Przegląd Prawa Administracyjnego\",\"volume\":\"86 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Przegląd Prawa Administracyjnego\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17951/ppa.2020.3.111-121\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przegląd Prawa Administracyjnego","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17951/ppa.2020.3.111-121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Realisation of Public Procurement during the COVID-19 Pandemic
The article deals with the analysis of major changes introduced to the Polish Public Procurement Law for the reason of the outbreak of the COVID-19 pandemic. First of all, the regulation in this area concerns the exclusion of the Public Procurement Law application in respect of necessary procurements. In addition, the legislator has introduced a mutual obligation to communicate about the impact of circumstances relating to the occurrence of COVID-19 on the proper performance of the contract and, as a consequence, the possibility of amending the public procurement contract. The last regulation has introduced solutions to reduce the costs of participation in tender proceedings and to encourage contractors to participate in public tenders.