高峰电力问题:安大略省工业电力定价系统如何影响消费者

Anindya Sen
{"title":"高峰电力问题:安大略省工业电力定价系统如何影响消费者","authors":"Anindya Sen","doi":"10.2139/ssrn.2617388","DOIUrl":null,"url":null,"abstract":"The Ontario government should scrap its peak-demand electricity-pricing program for large industrial electricity users in order to lower costs for Ontario households, according to a new C.D. Howe Institute report. In “Peak Power Problems: How Ontario’s Industrial Electricity Pricing System Impacts Consumers,” author Anindya Sen suggests that this program is responsible for one-quarter of the increased costs of electricity for households.","PeriodicalId":243835,"journal":{"name":"Canadian Law eJournal","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Peak Power Problems: How Ontario's Industrial Electricity Pricing System Impacts Consumers\",\"authors\":\"Anindya Sen\",\"doi\":\"10.2139/ssrn.2617388\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Ontario government should scrap its peak-demand electricity-pricing program for large industrial electricity users in order to lower costs for Ontario households, according to a new C.D. Howe Institute report. In “Peak Power Problems: How Ontario’s Industrial Electricity Pricing System Impacts Consumers,” author Anindya Sen suggests that this program is responsible for one-quarter of the increased costs of electricity for households.\",\"PeriodicalId\":243835,\"journal\":{\"name\":\"Canadian Law eJournal\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Canadian Law eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2617388\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Canadian Law eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2617388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

根据C.D. Howe研究所的一份新报告,安大略省政府应该取消针对大型工业用电用户的高峰需求电价计划,以降低安大略省家庭的用电成本。在《高峰电力问题:安大略省的工业电价系统如何影响消费者》一书中,作者Anindya Sen指出,该计划要为家庭电力成本增加的四分之一负责。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Peak Power Problems: How Ontario's Industrial Electricity Pricing System Impacts Consumers
The Ontario government should scrap its peak-demand electricity-pricing program for large industrial electricity users in order to lower costs for Ontario households, according to a new C.D. Howe Institute report. In “Peak Power Problems: How Ontario’s Industrial Electricity Pricing System Impacts Consumers,” author Anindya Sen suggests that this program is responsible for one-quarter of the increased costs of electricity for households.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信