{"title":"高β超导射频腔的操作经验","authors":"H. Dylla, L. Doolittle, J. Benesch","doi":"10.1109/PAC.1993.308784","DOIUrl":null,"url":null,"abstract":"The number of installed and operational /spl beta/=1 superconducting RF cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed.<<ETX>>","PeriodicalId":128308,"journal":{"name":"Proceedings of International Conference on Particle Accelerators","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Operating experience with high beta superconducting RF cavities\",\"authors\":\"H. Dylla, L. Doolittle, J. Benesch\",\"doi\":\"10.1109/PAC.1993.308784\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The number of installed and operational /spl beta/=1 superconducting RF cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed.<<ETX>>\",\"PeriodicalId\":128308,\"journal\":{\"name\":\"Proceedings of International Conference on Particle Accelerators\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-05-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of International Conference on Particle Accelerators\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.1993.308784\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of International Conference on Particle Accelerators","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1993.308784","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Operating experience with high beta superconducting RF cavities
The number of installed and operational /spl beta/=1 superconducting RF cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed.<>