{"title":"考虑优先发电和市场合同连接的电力平衡工程实用管理模型","authors":"Liang Han, Yuou Hu, Jing Zhang, Fubo Cui, Naijun Xu, Heming Liu, Jing Liu","doi":"10.1117/12.2673481","DOIUrl":null,"url":null,"abstract":"With the continuous deepening of the power market reform, the contradiction between the priority assurance electricity of the power generation side and the consumption side and the free competition market trading electricity is gradually prominent, which affects the power plan balance management and market organization design of market managers. Under this background, considering multiple kinds of constraints such as unit maintenance, electricity assurance, contracts execution, actual generation deviation, and taking maximizing the electricity guarantee at the generation side as the objective, this paper constructs a modified matrix factorization model based on the two-way horizontal-vertical intersection of power generation priority, and designs an engineering practical management mechanism that meets the two electricity balance management needs of annual balance and rolling balance, and verifies its effectiveness and adaptability by practical examples, which provide important support for market management and system stability in the power market development.","PeriodicalId":176918,"journal":{"name":"2nd International Conference on Digital Society and Intelligent Systems (DSInS 2022)","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Engineering practical management model of electricity balance considering the connections of priority generation and market contracts\",\"authors\":\"Liang Han, Yuou Hu, Jing Zhang, Fubo Cui, Naijun Xu, Heming Liu, Jing Liu\",\"doi\":\"10.1117/12.2673481\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the continuous deepening of the power market reform, the contradiction between the priority assurance electricity of the power generation side and the consumption side and the free competition market trading electricity is gradually prominent, which affects the power plan balance management and market organization design of market managers. Under this background, considering multiple kinds of constraints such as unit maintenance, electricity assurance, contracts execution, actual generation deviation, and taking maximizing the electricity guarantee at the generation side as the objective, this paper constructs a modified matrix factorization model based on the two-way horizontal-vertical intersection of power generation priority, and designs an engineering practical management mechanism that meets the two electricity balance management needs of annual balance and rolling balance, and verifies its effectiveness and adaptability by practical examples, which provide important support for market management and system stability in the power market development.\",\"PeriodicalId\":176918,\"journal\":{\"name\":\"2nd International Conference on Digital Society and Intelligent Systems (DSInS 2022)\",\"volume\":\"68 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2nd International Conference on Digital Society and Intelligent Systems (DSInS 2022)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2673481\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2nd International Conference on Digital Society and Intelligent Systems (DSInS 2022)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2673481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Engineering practical management model of electricity balance considering the connections of priority generation and market contracts
With the continuous deepening of the power market reform, the contradiction between the priority assurance electricity of the power generation side and the consumption side and the free competition market trading electricity is gradually prominent, which affects the power plan balance management and market organization design of market managers. Under this background, considering multiple kinds of constraints such as unit maintenance, electricity assurance, contracts execution, actual generation deviation, and taking maximizing the electricity guarantee at the generation side as the objective, this paper constructs a modified matrix factorization model based on the two-way horizontal-vertical intersection of power generation priority, and designs an engineering practical management mechanism that meets the two electricity balance management needs of annual balance and rolling balance, and verifies its effectiveness and adaptability by practical examples, which provide important support for market management and system stability in the power market development.