工作负荷和工作量对新制糖厂员工工作表现的影响

Ahsana Nadiyya Amany
{"title":"工作负荷和工作量对新制糖厂员工工作表现的影响","authors":"Ahsana Nadiyya Amany","doi":"10.33752/bima.v2i2.137","DOIUrl":null,"url":null,"abstract":"The purpose of this analyze the effect of staffing and workload toward employee work performance at Sugar Factory of Djombang Baru. This type of research is associative description and sample collection techniques are purposive side techniques with a total sample of 122 employees of Sugar Factory in Djombang Baru. Data collection techniques using observation, interviews, questionnaires and documentation. Data analysis techniques using multiple linier regression. The results of this study indicate that, 1) Staffing has a partially significant effect on the work performance  Djombang Baru Sugar Factory employees, 2) Workload has partially significant effect on the work performance Djombang Baru Sugar Factory employees and, 3) Staffing and workload simultaneously affects work performance of Djombang Baru Sugar Factory employees.","PeriodicalId":186204,"journal":{"name":"BIMA : Journal of Business and Innovation Management","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pengaruh Staffing dan Beban Kerja Terhadap Prestasi Kerja Karyawan di Pabrik Gula Djombang Baru\",\"authors\":\"Ahsana Nadiyya Amany\",\"doi\":\"10.33752/bima.v2i2.137\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this analyze the effect of staffing and workload toward employee work performance at Sugar Factory of Djombang Baru. This type of research is associative description and sample collection techniques are purposive side techniques with a total sample of 122 employees of Sugar Factory in Djombang Baru. Data collection techniques using observation, interviews, questionnaires and documentation. Data analysis techniques using multiple linier regression. The results of this study indicate that, 1) Staffing has a partially significant effect on the work performance  Djombang Baru Sugar Factory employees, 2) Workload has partially significant effect on the work performance Djombang Baru Sugar Factory employees and, 3) Staffing and workload simultaneously affects work performance of Djombang Baru Sugar Factory employees.\",\"PeriodicalId\":186204,\"journal\":{\"name\":\"BIMA : Journal of Business and Innovation Management\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"BIMA : Journal of Business and Innovation Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33752/bima.v2i2.137\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"BIMA : Journal of Business and Innovation Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33752/bima.v2i2.137","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是分析Djombang Baru糖厂的人员配备和工作量对员工工作绩效的影响。本研究采用联想描述法,样本收集法为目的侧法,共选取Djombang Baru糖厂122名员工为样本。数据收集技术使用观察,访谈,问卷调查和文件。使用多元线性回归的数据分析技术。本研究结果表明,1)人员配置对Djombang Baru糖厂员工的工作绩效有部分显著影响,2)工作量对Djombang Baru糖厂员工的工作绩效有部分显著影响,3)人员配置和工作量同时影响Djombang Baru糖厂员工的工作绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pengaruh Staffing dan Beban Kerja Terhadap Prestasi Kerja Karyawan di Pabrik Gula Djombang Baru
The purpose of this analyze the effect of staffing and workload toward employee work performance at Sugar Factory of Djombang Baru. This type of research is associative description and sample collection techniques are purposive side techniques with a total sample of 122 employees of Sugar Factory in Djombang Baru. Data collection techniques using observation, interviews, questionnaires and documentation. Data analysis techniques using multiple linier regression. The results of this study indicate that, 1) Staffing has a partially significant effect on the work performance  Djombang Baru Sugar Factory employees, 2) Workload has partially significant effect on the work performance Djombang Baru Sugar Factory employees and, 3) Staffing and workload simultaneously affects work performance of Djombang Baru Sugar Factory employees.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信