Poleang中央市场开发项目实施职业安全卫生(K3)的成本评估与分析

M. A. R. Janwar, A. Makkawaru, S. Sufrianto, Hado Hado
{"title":"Poleang中央市场开发项目实施职业安全卫生(K3)的成本评估与分析","authors":"M. A. R. Janwar, A. Makkawaru, S. Sufrianto, Hado Hado","doi":"10.54297/sciej.v4i1.462","DOIUrl":null,"url":null,"abstract":"Occupational Safety and Health (K3) issues in general in Indonesia are often neglected. This is indicated by the still high number of work accidents. This general problem regarding K3 also occurs in construction operations. The construction service sector is one of the sectors most at risk of work accidents. Loss of life, material, money and time are the consequences which of course will directly hinder the implementation of construction projects. Occupational safety and health aims to create conditions that support work comfort for workers. Occupational Health and Safety (K3) is often neglected, because it is considered a waste of time, moreover it costs a lot of money for (K3). Therefore, planning for Occupational Safety and Health Costs in Building Construction Projects is required. The total cost for the construction of the Poleang Central Market in Bombana district is IDR 39,927,000,000. Meanwhile, the cost allocation for the application of occupational safety and health (K3) required in the Development of the Poleang Central Market in Bombana Regency is Rp. 84,150,000.00 (0.211%). Based on observational data obtained in the field, the implementation of occupational safety and health (K3) in the Poleang Central Market development project is generally good","PeriodicalId":275633,"journal":{"name":"Sultra Civil Engineering Journal","volume":"391 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost Evaluation and Analysis Of Occupational Safety And Health (K3) Implementation In The Poleang Central Market Development Project\",\"authors\":\"M. A. R. Janwar, A. Makkawaru, S. Sufrianto, Hado Hado\",\"doi\":\"10.54297/sciej.v4i1.462\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Occupational Safety and Health (K3) issues in general in Indonesia are often neglected. This is indicated by the still high number of work accidents. This general problem regarding K3 also occurs in construction operations. The construction service sector is one of the sectors most at risk of work accidents. Loss of life, material, money and time are the consequences which of course will directly hinder the implementation of construction projects. Occupational safety and health aims to create conditions that support work comfort for workers. Occupational Health and Safety (K3) is often neglected, because it is considered a waste of time, moreover it costs a lot of money for (K3). Therefore, planning for Occupational Safety and Health Costs in Building Construction Projects is required. The total cost for the construction of the Poleang Central Market in Bombana district is IDR 39,927,000,000. Meanwhile, the cost allocation for the application of occupational safety and health (K3) required in the Development of the Poleang Central Market in Bombana Regency is Rp. 84,150,000.00 (0.211%). Based on observational data obtained in the field, the implementation of occupational safety and health (K3) in the Poleang Central Market development project is generally good\",\"PeriodicalId\":275633,\"journal\":{\"name\":\"Sultra Civil Engineering Journal\",\"volume\":\"391 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sultra Civil Engineering Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54297/sciej.v4i1.462\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sultra Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54297/sciej.v4i1.462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在印度尼西亚,职业安全和健康(K3)问题通常被忽视。工作事故的数量仍然很高就说明了这一点。这个关于K3的普遍问题也发生在施工作业中。建筑服务行业是最容易发生工伤事故的行业之一。造成的后果是生命、物质、金钱和时间的损失,这当然会直接阻碍建设项目的实施。职业安全和健康的目的是创造有利于工人舒适工作的条件。职业健康与安全(K3)经常被忽视,因为它被认为是浪费时间,而且(K3)需要花费很多钱。因此,对建筑工程中的职业安全与健康成本进行规划是必要的。Bombana地区Poleang中央市场的建设总成本为399.27亿印尼盾。同时,在Bombana Regency的Poleang中央市场开发中,应用职业安全和健康(K3)所需的成本分配为84,150,000.00卢比(0.211%)。根据实地获得的观测数据,Poleang中央市场开发项目的职业安全与健康(K3)实施情况总体良好
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cost Evaluation and Analysis Of Occupational Safety And Health (K3) Implementation In The Poleang Central Market Development Project
Occupational Safety and Health (K3) issues in general in Indonesia are often neglected. This is indicated by the still high number of work accidents. This general problem regarding K3 also occurs in construction operations. The construction service sector is one of the sectors most at risk of work accidents. Loss of life, material, money and time are the consequences which of course will directly hinder the implementation of construction projects. Occupational safety and health aims to create conditions that support work comfort for workers. Occupational Health and Safety (K3) is often neglected, because it is considered a waste of time, moreover it costs a lot of money for (K3). Therefore, planning for Occupational Safety and Health Costs in Building Construction Projects is required. The total cost for the construction of the Poleang Central Market in Bombana district is IDR 39,927,000,000. Meanwhile, the cost allocation for the application of occupational safety and health (K3) required in the Development of the Poleang Central Market in Bombana Regency is Rp. 84,150,000.00 (0.211%). Based on observational data obtained in the field, the implementation of occupational safety and health (K3) in the Poleang Central Market development project is generally good
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信