分散电源一次馈线保护装置(再闭合器)故障分析

Chanhyeok Kim, Hyeonseok Park, Seong-ho Ji, D. Rho
{"title":"分散电源一次馈线保护装置(再闭合器)故障分析","authors":"Chanhyeok Kim, Hyeonseok Park, Seong-ho Ji, D. Rho","doi":"10.1109/TD-ASIA.2009.5356883","DOIUrl":null,"url":null,"abstract":"Recently, new dispersed power sources such as photovoltaic, wind power, fuel cell etc. are energetically interconnected and operated in the distribution systems, as one of the national projects for alternative energy. The technical guidelines on the interconnection of dispersed power sources have been established and conducted positively. However, protection devices (Re-closer) in primary feeder of distribution system interconnected with dispersed power sources like photovoltaic generation systems may cause problems of malfunction, and then many customers could have problems like an interruption. So, this paper presents the optimal method to minimize the impact of interruption, using MATLAB /SIMULINK. And, also this paper shows the effectiveness of proposed method by simulating at the field distribution systems.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis for the mal-function of protective devices (Re-closer) at the primary feeders with dispersed power sources\",\"authors\":\"Chanhyeok Kim, Hyeonseok Park, Seong-ho Ji, D. Rho\",\"doi\":\"10.1109/TD-ASIA.2009.5356883\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recently, new dispersed power sources such as photovoltaic, wind power, fuel cell etc. are energetically interconnected and operated in the distribution systems, as one of the national projects for alternative energy. The technical guidelines on the interconnection of dispersed power sources have been established and conducted positively. However, protection devices (Re-closer) in primary feeder of distribution system interconnected with dispersed power sources like photovoltaic generation systems may cause problems of malfunction, and then many customers could have problems like an interruption. So, this paper presents the optimal method to minimize the impact of interruption, using MATLAB /SIMULINK. And, also this paper shows the effectiveness of proposed method by simulating at the field distribution systems.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356883\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,光伏、风电、燃料电池等新型分散电源作为国家替代能源项目之一,在配电网中大力互联运行。《分散电源互联技术导则》已经制定并积极实施。然而,与光伏发电系统等分散电源互连的配电系统一次馈线的保护装置(Re-closer)可能会出现故障问题,从而导致许多客户出现中断等问题。因此,本文利用MATLAB /SIMULINK给出了使中断影响最小化的最优方法。并通过对现场配电系统的仿真,验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis for the mal-function of protective devices (Re-closer) at the primary feeders with dispersed power sources
Recently, new dispersed power sources such as photovoltaic, wind power, fuel cell etc. are energetically interconnected and operated in the distribution systems, as one of the national projects for alternative energy. The technical guidelines on the interconnection of dispersed power sources have been established and conducted positively. However, protection devices (Re-closer) in primary feeder of distribution system interconnected with dispersed power sources like photovoltaic generation systems may cause problems of malfunction, and then many customers could have problems like an interruption. So, this paper presents the optimal method to minimize the impact of interruption, using MATLAB /SIMULINK. And, also this paper shows the effectiveness of proposed method by simulating at the field distribution systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信