J. Frunt, Wil L. Kling, R. M. Hermans, F. Nobel, Wouter W. de Boer
{"title":"设计变量对平衡市场的影响","authors":"J. Frunt, Wil L. Kling, R. M. Hermans, F. Nobel, Wouter W. de Boer","doi":"10.1109/EEM.2010.5558680","DOIUrl":null,"url":null,"abstract":"In electrical power systems there must always exist a balance between generation and load. Any imbalance will result in a frequency deviation and a deviation from the scheduled cross border exchange. To maintain and restore the balance in a certain area balancing systems exist. Balancing systems based on balance responsibility are affected by several design variables. This article discusses the effect of the programme time unit length and the gate-closure time.","PeriodicalId":310310,"journal":{"name":"2010 7th International Conference on the European Energy Market","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Impact of design variables on balancing markets\",\"authors\":\"J. Frunt, Wil L. Kling, R. M. Hermans, F. Nobel, Wouter W. de Boer\",\"doi\":\"10.1109/EEM.2010.5558680\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In electrical power systems there must always exist a balance between generation and load. Any imbalance will result in a frequency deviation and a deviation from the scheduled cross border exchange. To maintain and restore the balance in a certain area balancing systems exist. Balancing systems based on balance responsibility are affected by several design variables. This article discusses the effect of the programme time unit length and the gate-closure time.\",\"PeriodicalId\":310310,\"journal\":{\"name\":\"2010 7th International Conference on the European Energy Market\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 7th International Conference on the European Energy Market\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2010.5558680\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 7th International Conference on the European Energy Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2010.5558680","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
In electrical power systems there must always exist a balance between generation and load. Any imbalance will result in a frequency deviation and a deviation from the scheduled cross border exchange. To maintain and restore the balance in a certain area balancing systems exist. Balancing systems based on balance responsibility are affected by several design variables. This article discusses the effect of the programme time unit length and the gate-closure time.