配电系统可靠性指标分布对中断成本/可靠性价值估计的影响

E. Wojczynski, R. Billinton
{"title":"配电系统可靠性指标分布对中断成本/可靠性价值估计的影响","authors":"E. Wojczynski, R. Billinton","doi":"10.1109/TPAS.1985.318836","DOIUrl":null,"url":null,"abstract":"Utilities increasingly are assessing system reliability from a cost/benefit point of view. Costs of interruptions are usually calculated to determine the benefit or worth of reliability. The paper reports on distribution system simulation studies which investigate the effect of interruption duration distributions and cost curve shapes on interruption cost estimates. It is found that use of the average outage duration to calculate interruption costs can, in a significant number of cases, result in large errors as compared with using the entire duration distribution. The use of the $/KWHR interruption cost coefficient form is compared with the duration specific $/KW form.","PeriodicalId":227345,"journal":{"name":"IEEE Transactions on Power Apparatus and Systems","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1985-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"32","resultStr":"{\"title\":\"Effects Of Distribution System Reliability Index Distributions Upon Interruption Cost/Reliability Worth Estimates\",\"authors\":\"E. Wojczynski, R. Billinton\",\"doi\":\"10.1109/TPAS.1985.318836\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Utilities increasingly are assessing system reliability from a cost/benefit point of view. Costs of interruptions are usually calculated to determine the benefit or worth of reliability. The paper reports on distribution system simulation studies which investigate the effect of interruption duration distributions and cost curve shapes on interruption cost estimates. It is found that use of the average outage duration to calculate interruption costs can, in a significant number of cases, result in large errors as compared with using the entire duration distribution. The use of the $/KWHR interruption cost coefficient form is compared with the duration specific $/KW form.\",\"PeriodicalId\":227345,\"journal\":{\"name\":\"IEEE Transactions on Power Apparatus and Systems\",\"volume\":\"96 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1985-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"32\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Power Apparatus and Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TPAS.1985.318836\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Power Apparatus and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TPAS.1985.318836","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 32

摘要

公用事业公司越来越多地从成本/收益的角度来评估系统可靠性。通常计算中断成本来确定可靠性的收益或价值。本文报道了配电系统的仿真研究,研究了中断时间分布和成本曲线形状对中断成本估算的影响。研究发现,与使用整个持续时间分布相比,在很多情况下,使用平均中断持续时间来计算中断成本会导致很大的误差。使用$/KWHR中断成本系数形式与持续时间特定的$/KW形式进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Effects Of Distribution System Reliability Index Distributions Upon Interruption Cost/Reliability Worth Estimates
Utilities increasingly are assessing system reliability from a cost/benefit point of view. Costs of interruptions are usually calculated to determine the benefit or worth of reliability. The paper reports on distribution system simulation studies which investigate the effect of interruption duration distributions and cost curve shapes on interruption cost estimates. It is found that use of the average outage duration to calculate interruption costs can, in a significant number of cases, result in large errors as compared with using the entire duration distribution. The use of the $/KWHR interruption cost coefficient form is compared with the duration specific $/KW form.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信