{"title":"雅加达中心阿什利酒店开发项目施工管理分析","authors":"Shilvy Aghniya, Saihul Anwar","doi":"10.33603/JGST.V3I2.2387","DOIUrl":null,"url":null,"abstract":"Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally. Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM). Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00. Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project\",\"authors\":\"Shilvy Aghniya, Saihul Anwar\",\"doi\":\"10.33603/JGST.V3I2.2387\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally. Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM). Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00. Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).\",\"PeriodicalId\":419103,\"journal\":{\"name\":\"Journal of Green Science and Technology\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Green Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33603/JGST.V3I2.2387\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/JGST.V3I2.2387","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project
Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally. Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM). Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00. Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).