{"title":"基于ilp的可延性fork-join任务调度","authors":"Kaname Shimada, Ittetsu Taniguchi, H. Tomiyama","doi":"10.1145/3373400.3373403","DOIUrl":null,"url":null,"abstract":"This paper studies scheduling of malleable fork-join tasks. In our scheduling problem, each task can be partitioned into multiple sub-tasks, and the sub-tasks are scheduled independently. The optimal number of sub-tasks is determined during scheduling simultaneously. This paper formulates the scheduling problem as an integer linear programming problem.","PeriodicalId":447904,"journal":{"name":"SIGBED Rev.","volume":"100 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"ILP-based scheduling for malleable fork-join tasks\",\"authors\":\"Kaname Shimada, Ittetsu Taniguchi, H. Tomiyama\",\"doi\":\"10.1145/3373400.3373403\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies scheduling of malleable fork-join tasks. In our scheduling problem, each task can be partitioned into multiple sub-tasks, and the sub-tasks are scheduled independently. The optimal number of sub-tasks is determined during scheduling simultaneously. This paper formulates the scheduling problem as an integer linear programming problem.\",\"PeriodicalId\":447904,\"journal\":{\"name\":\"SIGBED Rev.\",\"volume\":\"100 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SIGBED Rev.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3373400.3373403\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SIGBED Rev.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3373400.3373403","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
ILP-based scheduling for malleable fork-join tasks
This paper studies scheduling of malleable fork-join tasks. In our scheduling problem, each task can be partitioned into multiple sub-tasks, and the sub-tasks are scheduled independently. The optimal number of sub-tasks is determined during scheduling simultaneously. This paper formulates the scheduling problem as an integer linear programming problem.