{"title":"快速输电系统保护系统的成本效益分析:发表于第71届保护继电器工程师年会上","authors":"Brian Ehsani, J. Hulme","doi":"10.1109/CPRE.2018.8349787","DOIUrl":null,"url":null,"abstract":"This paper analyzes the effects of reducing tripping times on the cost of a transmission system. A range of trip times are examined to demonstrate the difference in the initial price tag of a transmission system as well as the ongoing cost. The increased cost of a slower tripping scheme is analyzed by investigating the relationship between substation ground grid and transmission line neutral conductor sizing and cost.","PeriodicalId":285875,"journal":{"name":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Cost benefit analysis of faster transmission system protection systems: Presented at the 71st annual conference for protective relay engineers\",\"authors\":\"Brian Ehsani, J. Hulme\",\"doi\":\"10.1109/CPRE.2018.8349787\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper analyzes the effects of reducing tripping times on the cost of a transmission system. A range of trip times are examined to demonstrate the difference in the initial price tag of a transmission system as well as the ongoing cost. The increased cost of a slower tripping scheme is analyzed by investigating the relationship between substation ground grid and transmission line neutral conductor sizing and cost.\",\"PeriodicalId\":285875,\"journal\":{\"name\":\"2018 71st Annual Conference for Protective Relay Engineers (CPRE)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 71st Annual Conference for Protective Relay Engineers (CPRE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2018.8349787\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2018.8349787","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文分析了减少跳闸次数对输电系统成本的影响。考察了一系列行程时间,以证明传输系统的初始价格标签以及持续成本的差异。通过对变电站地网和输电线路中性导体尺寸与成本的关系的研究,分析了慢脱扣方案所增加的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cost benefit analysis of faster transmission system protection systems: Presented at the 71st annual conference for protective relay engineers
This paper analyzes the effects of reducing tripping times on the cost of a transmission system. A range of trip times are examined to demonstrate the difference in the initial price tag of a transmission system as well as the ongoing cost. The increased cost of a slower tripping scheme is analyzed by investigating the relationship between substation ground grid and transmission line neutral conductor sizing and cost.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信