采用层次分析法和遗传算法对输电线路进行评价和布线

M. Hosseini, H. Bahmani
{"title":"采用层次分析法和遗传算法对输电线路进行评价和布线","authors":"M. Hosseini, H. Bahmani","doi":"10.1109/ISCI.2011.5958886","DOIUrl":null,"url":null,"abstract":"Today optimization is one of the most important issues in all engineering fields. According to importance of this issue in planning power transmission lines, appropriate areas have been accreted for numerous researches. Widespread usages of GIS application and its combination with GA base methods offer practical solution for power transmission lines design. In this paper, we first study about efficient criteria for selecting appropriate points for installing towers, and then we can evaluate available points for installing power towers by one of the multi-criteria decision-making analysis, named Analytic Hierarchy Process. As we know, all of these nodes are not suitable for being one of the transmission line Points. So by using this procedure (AHP) we calculate cost function of transmission line between towers. Finally, with GA algorithm, the best and the most optimum route between source and destination will be selected.","PeriodicalId":166647,"journal":{"name":"2011 IEEE Symposium on Computers & Informatics","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Evaluation and routing of power transmission lines by using AHP method and genetic algorithm\",\"authors\":\"M. Hosseini, H. Bahmani\",\"doi\":\"10.1109/ISCI.2011.5958886\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Today optimization is one of the most important issues in all engineering fields. According to importance of this issue in planning power transmission lines, appropriate areas have been accreted for numerous researches. Widespread usages of GIS application and its combination with GA base methods offer practical solution for power transmission lines design. In this paper, we first study about efficient criteria for selecting appropriate points for installing towers, and then we can evaluate available points for installing power towers by one of the multi-criteria decision-making analysis, named Analytic Hierarchy Process. As we know, all of these nodes are not suitable for being one of the transmission line Points. So by using this procedure (AHP) we calculate cost function of transmission line between towers. Finally, with GA algorithm, the best and the most optimum route between source and destination will be selected.\",\"PeriodicalId\":166647,\"journal\":{\"name\":\"2011 IEEE Symposium on Computers & Informatics\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE Symposium on Computers & Informatics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISCI.2011.5958886\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Symposium on Computers & Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISCI.2011.5958886","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

当今,优化是所有工程领域中最重要的问题之一。鉴于这一问题在输电线路规划中的重要性,人们开辟了大量的研究领域。GIS应用的广泛应用及其与遗传算法基法的结合为输电线路设计提供了切实可行的解决方案。本文首先研究了选择合适的铁塔安装点的有效准则,然后利用层次分析法的多准则决策分析方法对铁塔安装点进行评价。众所周知,并非所有这些节点都适合作为传输线点之一。因此,采用层次分析法计算了塔间输电线路的成本函数。最后,利用遗传算法选择源和目的之间的最佳和最优路由。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation and routing of power transmission lines by using AHP method and genetic algorithm
Today optimization is one of the most important issues in all engineering fields. According to importance of this issue in planning power transmission lines, appropriate areas have been accreted for numerous researches. Widespread usages of GIS application and its combination with GA base methods offer practical solution for power transmission lines design. In this paper, we first study about efficient criteria for selecting appropriate points for installing towers, and then we can evaluate available points for installing power towers by one of the multi-criteria decision-making analysis, named Analytic Hierarchy Process. As we know, all of these nodes are not suitable for being one of the transmission line Points. So by using this procedure (AHP) we calculate cost function of transmission line between towers. Finally, with GA algorithm, the best and the most optimum route between source and destination will be selected.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信