基于模糊层次分析法的智能电网小型机组发电机组选址

R. Shrestha, D. Wagner, I. Al-Anbagi
{"title":"基于模糊层次分析法的智能电网小型机组发电机组选址","authors":"R. Shrestha, D. Wagner, I. Al-Anbagi","doi":"10.1109/EPEC.2018.8598393","DOIUrl":null,"url":null,"abstract":"Distributed Generation (DG) resources could help in mitigating the increase in the electricity demand and the high burden on the central grid by reducing the transmission and distribution power losses. As the name implies, DG resources are in general located in a distributed manner near the load centers. Therefore, choosing a proper site for a new DG is a critical step for its long term efficient power generation. In addition, DG siting involves many factors such as economic, social, environment, geographic, availability of electrical infrastructure, etc. Examples of DGs include, solar panels, micro wind turbines, small hydropower units, fuel cells and Small Modular Reactors (SMRs). In this paper, we introduce a model using the Analytical Hierarchy Process (AHP) and the Fuzzy AHP (FAHP) algorithms to develop a ranking system to choose proper sites for SMR power generation units. We consider electrical and non-electrical loads, existing and retiring generation, transmission lines, switching stations as the location-dependant scenarios for determining suitable locations. We produce more precise results by implementing fuzzy logic based AHP algorithm which deals with the linguistic vagueness and uncertainty of the siting data.","PeriodicalId":265297,"journal":{"name":"2018 IEEE Electrical Power and Energy Conference (EPEC)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Fuzzy AHP-based Siting of Small Modular Reactors for Power Generation in the Smart Grid\",\"authors\":\"R. Shrestha, D. Wagner, I. Al-Anbagi\",\"doi\":\"10.1109/EPEC.2018.8598393\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Distributed Generation (DG) resources could help in mitigating the increase in the electricity demand and the high burden on the central grid by reducing the transmission and distribution power losses. As the name implies, DG resources are in general located in a distributed manner near the load centers. Therefore, choosing a proper site for a new DG is a critical step for its long term efficient power generation. In addition, DG siting involves many factors such as economic, social, environment, geographic, availability of electrical infrastructure, etc. Examples of DGs include, solar panels, micro wind turbines, small hydropower units, fuel cells and Small Modular Reactors (SMRs). In this paper, we introduce a model using the Analytical Hierarchy Process (AHP) and the Fuzzy AHP (FAHP) algorithms to develop a ranking system to choose proper sites for SMR power generation units. We consider electrical and non-electrical loads, existing and retiring generation, transmission lines, switching stations as the location-dependant scenarios for determining suitable locations. We produce more precise results by implementing fuzzy logic based AHP algorithm which deals with the linguistic vagueness and uncertainty of the siting data.\",\"PeriodicalId\":265297,\"journal\":{\"name\":\"2018 IEEE Electrical Power and Energy Conference (EPEC)\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Electrical Power and Energy Conference (EPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPEC.2018.8598393\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Electrical Power and Energy Conference (EPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2018.8598393","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

摘要

分布式发电资源可以通过减少输配电损失,帮助缓解电力需求的增加和中央电网的沉重负担。顾名思义,DG资源一般分布在负荷中心附近。因此,为新DG选择合适的地点是其长期高效发电的关键一步。此外,DG选址还涉及经济、社会、环境、地理、电力基础设施的可用性等诸多因素。DGs的例子包括太阳能电池板、微型风力涡轮机、小型水力发电机组、燃料电池和小型模块化反应堆(SMRs)。本文采用层次分析法(AHP)和模糊层次分析法(FAHP)建立了小型堆发电机组选址排序系统。我们考虑了电力和非电力负荷、现有和退役发电、输电线路、开关站等与位置相关的情况,以确定合适的位置。采用基于模糊逻辑的AHP算法来处理选址数据的语言模糊性和不确定性,从而得到更精确的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Fuzzy AHP-based Siting of Small Modular Reactors for Power Generation in the Smart Grid
Distributed Generation (DG) resources could help in mitigating the increase in the electricity demand and the high burden on the central grid by reducing the transmission and distribution power losses. As the name implies, DG resources are in general located in a distributed manner near the load centers. Therefore, choosing a proper site for a new DG is a critical step for its long term efficient power generation. In addition, DG siting involves many factors such as economic, social, environment, geographic, availability of electrical infrastructure, etc. Examples of DGs include, solar panels, micro wind turbines, small hydropower units, fuel cells and Small Modular Reactors (SMRs). In this paper, we introduce a model using the Analytical Hierarchy Process (AHP) and the Fuzzy AHP (FAHP) algorithms to develop a ranking system to choose proper sites for SMR power generation units. We consider electrical and non-electrical loads, existing and retiring generation, transmission lines, switching stations as the location-dependant scenarios for determining suitable locations. We produce more precise results by implementing fuzzy logic based AHP algorithm which deals with the linguistic vagueness and uncertainty of the siting data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信