配电系统洪水前岛屿形成解决局部关键基础设施相互依赖问题

M. Bahrami, M. Vakilian, H. Farzin, M. Lehtonen
{"title":"配电系统洪水前岛屿形成解决局部关键基础设施相互依赖问题","authors":"M. Bahrami, M. Vakilian, H. Farzin, M. Lehtonen","doi":"10.1109/EPDC53015.2021.9610817","DOIUrl":null,"url":null,"abstract":"Floodwater can severely damage electricity distribution system (DS) components and interrupt the service to all the customers, even the critical ones. Thus, it is necessary to evaluate the possible impacts of a flooding event on DS operation. This paper proposes a new framework that constructs islands prior to flood occurrence, for continuation of electricity supply to the critical loads realizing different important infrastructures interdependency. The interdependencies between different local critical infrastructures are modeled in this framework. In addition, distributed generators (DGs) as well as the underground cables are considered as vulnerable components to flooding. The proposed framework divides a DS into several islands before flood formation. It is implemented on the 33-bus distribution test system, and its effectiveness in improvement of electricity supply continuation to the critical loads is verified through some case studies.","PeriodicalId":142680,"journal":{"name":"2021 25th Electrical Power Distribution Conference (EPDC)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Pre-Flooding Island Formation in Distribution Systems Resolving Local Critical Infrastructures Interdependency\",\"authors\":\"M. Bahrami, M. Vakilian, H. Farzin, M. Lehtonen\",\"doi\":\"10.1109/EPDC53015.2021.9610817\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Floodwater can severely damage electricity distribution system (DS) components and interrupt the service to all the customers, even the critical ones. Thus, it is necessary to evaluate the possible impacts of a flooding event on DS operation. This paper proposes a new framework that constructs islands prior to flood occurrence, for continuation of electricity supply to the critical loads realizing different important infrastructures interdependency. The interdependencies between different local critical infrastructures are modeled in this framework. In addition, distributed generators (DGs) as well as the underground cables are considered as vulnerable components to flooding. The proposed framework divides a DS into several islands before flood formation. It is implemented on the 33-bus distribution test system, and its effectiveness in improvement of electricity supply continuation to the critical loads is verified through some case studies.\",\"PeriodicalId\":142680,\"journal\":{\"name\":\"2021 25th Electrical Power Distribution Conference (EPDC)\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 25th Electrical Power Distribution Conference (EPDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPDC53015.2021.9610817\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 25th Electrical Power Distribution Conference (EPDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPDC53015.2021.9610817","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

洪水会严重损坏配电系统的部件,中断所有用户的服务,甚至是关键用户。因此,有必要评估洪水事件对DS作业可能产生的影响。本文提出了一种新的框架,即在洪水发生之前建造岛屿,以实现对关键负荷的持续供电,实现不同重要基础设施的相互依赖。不同本地关键基础设施之间的相互依赖关系在此框架中建模。此外,分布式发电机(dg)和地下电缆被认为是易受洪水影响的部件。建议的框架在洪水形成之前将DS划分为几个岛屿。在33母线配电试验系统上进行了实施,并通过实例验证了该方法在改善关键负荷供电连续性方面的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pre-Flooding Island Formation in Distribution Systems Resolving Local Critical Infrastructures Interdependency
Floodwater can severely damage electricity distribution system (DS) components and interrupt the service to all the customers, even the critical ones. Thus, it is necessary to evaluate the possible impacts of a flooding event on DS operation. This paper proposes a new framework that constructs islands prior to flood occurrence, for continuation of electricity supply to the critical loads realizing different important infrastructures interdependency. The interdependencies between different local critical infrastructures are modeled in this framework. In addition, distributed generators (DGs) as well as the underground cables are considered as vulnerable components to flooding. The proposed framework divides a DS into several islands before flood formation. It is implemented on the 33-bus distribution test system, and its effectiveness in improvement of electricity supply continuation to the critical loads is verified through some case studies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信