{"title":"某钢厂设备选型的仿真模型","authors":"P. Nassau","doi":"10.1145/1102838.1102843","DOIUrl":null,"url":null,"abstract":"A simulation model was developed to determine the optimal policy for utilization and replacement of moving equipment in a steel plant. Specifically, this paper deals with the problem of slag removal in a melt-shop composed of a batch of five electric-arc furnaces. The environment of high temperatures in which service has to take place leads to conditions of frequent equipment break-down and a dynamic rescheduling of activities, which makes the use of simulation a necessity. One important feature that was included in the model was the process of \"aging\", that is, that service time is a function of the number of minutes that the slag has been waiting for its removal.","PeriodicalId":138785,"journal":{"name":"ACM Sigsim Simulation Digest","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A simulation model for equipment selection in a steel plant\",\"authors\":\"P. Nassau\",\"doi\":\"10.1145/1102838.1102843\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A simulation model was developed to determine the optimal policy for utilization and replacement of moving equipment in a steel plant. Specifically, this paper deals with the problem of slag removal in a melt-shop composed of a batch of five electric-arc furnaces. The environment of high temperatures in which service has to take place leads to conditions of frequent equipment break-down and a dynamic rescheduling of activities, which makes the use of simulation a necessity. One important feature that was included in the model was the process of \\\"aging\\\", that is, that service time is a function of the number of minutes that the slag has been waiting for its removal.\",\"PeriodicalId\":138785,\"journal\":{\"name\":\"ACM Sigsim Simulation Digest\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACM Sigsim Simulation Digest\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1102838.1102843\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACM Sigsim Simulation Digest","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1102838.1102843","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A simulation model for equipment selection in a steel plant
A simulation model was developed to determine the optimal policy for utilization and replacement of moving equipment in a steel plant. Specifically, this paper deals with the problem of slag removal in a melt-shop composed of a batch of five electric-arc furnaces. The environment of high temperatures in which service has to take place leads to conditions of frequent equipment break-down and a dynamic rescheduling of activities, which makes the use of simulation a necessity. One important feature that was included in the model was the process of "aging", that is, that service time is a function of the number of minutes that the slag has been waiting for its removal.