{"title":"三个简单的步骤来削减高峰在得克萨斯州(ERCOT)电力市场","authors":"J. Zarnikau","doi":"10.2139/ssrn.2334001","DOIUrl":null,"url":null,"abstract":"Electricity resource adequacy is the most urgent and controversial challenge facing the Electric Reliability Council of Texas (ERCOT) market. The policy discussions have neglected some very simple steps that could be taken to promote demand response and reduce peak demand. An allocation of some of the responsibility for non-spinning reserves based on the contribution of a load serving entity (LSE) to peak demand would encourage LSEs to undertake programs to reduce their contribution to the peak. An extension of the four coincident peak (4 CP) pricing used to charge large industrial energy consumers for transmission services to smaller commercial and residential loads would encourage smaller consumers to reduce their peak usage. Narrowing the definition of “peak demand” in the Public Utility Commission of Texas (PUCT) energy efficiency rules would encourage energy efficiency measures better focused on peak demand reduction.","PeriodicalId":126680,"journal":{"name":"SRPN: Product Demand Issues (Topic)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Three Simple Steps to Clip the Peak in the Texas (ERCOT) Electricity Market\",\"authors\":\"J. Zarnikau\",\"doi\":\"10.2139/ssrn.2334001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electricity resource adequacy is the most urgent and controversial challenge facing the Electric Reliability Council of Texas (ERCOT) market. The policy discussions have neglected some very simple steps that could be taken to promote demand response and reduce peak demand. An allocation of some of the responsibility for non-spinning reserves based on the contribution of a load serving entity (LSE) to peak demand would encourage LSEs to undertake programs to reduce their contribution to the peak. An extension of the four coincident peak (4 CP) pricing used to charge large industrial energy consumers for transmission services to smaller commercial and residential loads would encourage smaller consumers to reduce their peak usage. Narrowing the definition of “peak demand” in the Public Utility Commission of Texas (PUCT) energy efficiency rules would encourage energy efficiency measures better focused on peak demand reduction.\",\"PeriodicalId\":126680,\"journal\":{\"name\":\"SRPN: Product Demand Issues (Topic)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-09-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SRPN: Product Demand Issues (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2334001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SRPN: Product Demand Issues (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2334001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
摘要
电力资源充足性是德克萨斯州电力可靠性委员会(ERCOT)市场面临的最紧迫和最具争议的挑战。政策讨论忽略了一些非常简单的步骤,这些步骤可以促进需求响应并减少需求峰值。根据负荷服务实体(LSE)对峰值需求的贡献来分配一些非旋转储备的责任,将鼓励LSE实施减少其对峰值贡献的计划。将向大型工业能源消费者收取传输服务费用的四个同步峰值(4cp)定价扩展到较小的商业和住宅负荷,将鼓励较小的消费者减少其峰值使用量。在德州公用事业委员会(Public Utility Commission of Texas, PUCT)的能效规定中,缩小“峰值需求”的定义,将鼓励能效措施更好地侧重于减少峰值需求。
Three Simple Steps to Clip the Peak in the Texas (ERCOT) Electricity Market
Electricity resource adequacy is the most urgent and controversial challenge facing the Electric Reliability Council of Texas (ERCOT) market. The policy discussions have neglected some very simple steps that could be taken to promote demand response and reduce peak demand. An allocation of some of the responsibility for non-spinning reserves based on the contribution of a load serving entity (LSE) to peak demand would encourage LSEs to undertake programs to reduce their contribution to the peak. An extension of the four coincident peak (4 CP) pricing used to charge large industrial energy consumers for transmission services to smaller commercial and residential loads would encourage smaller consumers to reduce their peak usage. Narrowing the definition of “peak demand” in the Public Utility Commission of Texas (PUCT) energy efficiency rules would encourage energy efficiency measures better focused on peak demand reduction.