{"title":"用符号统计分析非参数控制图的稳态行为","authors":"S. K. Khilare, D. T. Shirke","doi":"10.1590/0103-6513.113112","DOIUrl":null,"url":null,"abstract":"If process is running for a long period in an in-control condition, it will reach in a steady-state condition. In order to study the long term properties of a control chart, it is appropriate to investigate the steady-state average time to signal. In this article, we discussed runs rules representation of a nonparametric synthetic control chart using sign statistic for detecting shifts in location parameter. We compared zero-state average time to signal with steady-state average time to signal of the synthetic control chart for symmetric and asymmetric distributions. We also present the m-of-m control chart using sign statistic. For comparison study, we computed average time to signal of the m-of-m control chart, the sign chart (1-of-1 chart) and the synthetic control chart for normal, Cauchy, double exponential and gamma distributions. Steady-state and zero-state performance of the m-of-m control chart with m = 2, 3 compared with the sign chart (1-of-1 chart) and synthetic control chart. The zero-state and steady-state average time to signal of the synthetic and the m-of-m control charts computed using Markov chain approach.","PeriodicalId":263089,"journal":{"name":"Production Journal","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Steady-state behavior of nonparametric control charts using sign statistic\",\"authors\":\"S. K. Khilare, D. T. Shirke\",\"doi\":\"10.1590/0103-6513.113112\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"If process is running for a long period in an in-control condition, it will reach in a steady-state condition. In order to study the long term properties of a control chart, it is appropriate to investigate the steady-state average time to signal. In this article, we discussed runs rules representation of a nonparametric synthetic control chart using sign statistic for detecting shifts in location parameter. We compared zero-state average time to signal with steady-state average time to signal of the synthetic control chart for symmetric and asymmetric distributions. We also present the m-of-m control chart using sign statistic. For comparison study, we computed average time to signal of the m-of-m control chart, the sign chart (1-of-1 chart) and the synthetic control chart for normal, Cauchy, double exponential and gamma distributions. Steady-state and zero-state performance of the m-of-m control chart with m = 2, 3 compared with the sign chart (1-of-1 chart) and synthetic control chart. The zero-state and steady-state average time to signal of the synthetic and the m-of-m control charts computed using Markov chain approach.\",\"PeriodicalId\":263089,\"journal\":{\"name\":\"Production Journal\",\"volume\":\"107 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/0103-6513.113112\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/0103-6513.113112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Steady-state behavior of nonparametric control charts using sign statistic
If process is running for a long period in an in-control condition, it will reach in a steady-state condition. In order to study the long term properties of a control chart, it is appropriate to investigate the steady-state average time to signal. In this article, we discussed runs rules representation of a nonparametric synthetic control chart using sign statistic for detecting shifts in location parameter. We compared zero-state average time to signal with steady-state average time to signal of the synthetic control chart for symmetric and asymmetric distributions. We also present the m-of-m control chart using sign statistic. For comparison study, we computed average time to signal of the m-of-m control chart, the sign chart (1-of-1 chart) and the synthetic control chart for normal, Cauchy, double exponential and gamma distributions. Steady-state and zero-state performance of the m-of-m control chart with m = 2, 3 compared with the sign chart (1-of-1 chart) and synthetic control chart. The zero-state and steady-state average time to signal of the synthetic and the m-of-m control charts computed using Markov chain approach.