增田土地复垦国家工程的农地保护

U. Award
{"title":"增田土地复垦国家工程的农地保护","authors":"U. Award","doi":"10.11408/JIERP1982.1987.69","DOIUrl":null,"url":null,"abstract":"In July 1983, the western part of Shimane prefecture was visited by the heaviest rainfall in this area in the history of observation. Maximum daily rainfall of 421 mm and maximum hourly rainfall of 97 mm was recorded. At that time, about 280ha of farmland there were no secondary disasters at all. The reasons why the land could withstand such a record-breaking localized torrential downpour were mainly two preventive programs: 1. Measures to keep a bank from breaking: (1) with a very gentle slope like 1:2.0, the bank can be set in dynamic steadiness and can he made compact. (2) Pipe drain set in a bank every two steps can prevent high pore water pressure in a bank. (3) The slope end can be reinforced by concrete gravity walls or frameworks. (4) A catchment canal set across the upper slope can protect the surface of the slope from erosion.","PeriodicalId":137099,"journal":{"name":"Journal of irrigation engineering and rural planning","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Farmland Conservation at Masuda Land Reclamation National Project\",\"authors\":\"U. Award\",\"doi\":\"10.11408/JIERP1982.1987.69\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In July 1983, the western part of Shimane prefecture was visited by the heaviest rainfall in this area in the history of observation. Maximum daily rainfall of 421 mm and maximum hourly rainfall of 97 mm was recorded. At that time, about 280ha of farmland there were no secondary disasters at all. The reasons why the land could withstand such a record-breaking localized torrential downpour were mainly two preventive programs: 1. Measures to keep a bank from breaking: (1) with a very gentle slope like 1:2.0, the bank can be set in dynamic steadiness and can he made compact. (2) Pipe drain set in a bank every two steps can prevent high pore water pressure in a bank. (3) The slope end can be reinforced by concrete gravity walls or frameworks. (4) A catchment canal set across the upper slope can protect the surface of the slope from erosion.\",\"PeriodicalId\":137099,\"journal\":{\"name\":\"Journal of irrigation engineering and rural planning\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of irrigation engineering and rural planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11408/JIERP1982.1987.69\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of irrigation engineering and rural planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11408/JIERP1982.1987.69","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1983年7月,岛根县西部出现了该地区有观测记录以来最大的降雨。录得最大日雨量421毫米及最大每小时雨量97毫米。当时约280公顷的农田完全没有发生次生灾害。这片土地之所以能够承受如此破纪录的局部暴雨,主要有两个预防措施:防止堤岸断裂的措施:(1)堤岸坡度非常平缓,如1:0 .0,可以设置为动态稳定,可以使堤岸变得紧凑。(2)每隔两步在库中设置管道排水,可防止库中孔隙水压力过高。(3)坡端可采用混凝土重力墙或框架加固。(4)在上坡设置集水渠,可以保护坡面不受侵蚀。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Farmland Conservation at Masuda Land Reclamation National Project
In July 1983, the western part of Shimane prefecture was visited by the heaviest rainfall in this area in the history of observation. Maximum daily rainfall of 421 mm and maximum hourly rainfall of 97 mm was recorded. At that time, about 280ha of farmland there were no secondary disasters at all. The reasons why the land could withstand such a record-breaking localized torrential downpour were mainly two preventive programs: 1. Measures to keep a bank from breaking: (1) with a very gentle slope like 1:2.0, the bank can be set in dynamic steadiness and can he made compact. (2) Pipe drain set in a bank every two steps can prevent high pore water pressure in a bank. (3) The slope end can be reinforced by concrete gravity walls or frameworks. (4) A catchment canal set across the upper slope can protect the surface of the slope from erosion.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信