{"title":"远距离负载","authors":"B. Alboyaci","doi":"10.1049/PE:20070506","DOIUrl":null,"url":null,"abstract":"LONG-DISTANCE POWER transfers from regions with surplus generation are taking place within Turkey in order to meet the demand in those regions without enough power. All this is taking place against a background where outside economic aspects play a dominant roll.","PeriodicalId":182274,"journal":{"name":"Power Engineer","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Long distance loads\",\"authors\":\"B. Alboyaci\",\"doi\":\"10.1049/PE:20070506\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"LONG-DISTANCE POWER transfers from regions with surplus generation are taking place within Turkey in order to meet the demand in those regions without enough power. All this is taking place against a background where outside economic aspects play a dominant roll.\",\"PeriodicalId\":182274,\"journal\":{\"name\":\"Power Engineer\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Power Engineer\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/PE:20070506\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/PE:20070506","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
LONG-DISTANCE POWER transfers from regions with surplus generation are taking place within Turkey in order to meet the demand in those regions without enough power. All this is taking place against a background where outside economic aspects play a dominant roll.