{"title":"发电企业容量成本补偿机制研究","authors":"Yuan Hu, Shijun Tian, Menghua Fan","doi":"10.1109/IFEEA57288.2022.10037895","DOIUrl":null,"url":null,"abstract":"With the implementation of the goal of “carbon peaking and carbon neutrality” and the continuous deepening of the construction of new power systems, the problem of tight supply and demand caused by the intermittent and uncertainty of renewable energy output has become increasingly prominent. In order to ensure the safe and reliable operation of the power system, this paper proposed a new capacity guarantee mechanism to compensate the power plants who provide capacity value for the power system, and the effects of unit output uncertainty and depreciation are also considered. This method can guarantee the construction of new units and the orderly exit of old units. Finally, the balance of power supply and demand in the long term can be reached, and the smooth and orderly progress of energy transformation will be accelerated.","PeriodicalId":304779,"journal":{"name":"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Research on capacity cost compensation mechanism on power generation companies\",\"authors\":\"Yuan Hu, Shijun Tian, Menghua Fan\",\"doi\":\"10.1109/IFEEA57288.2022.10037895\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the implementation of the goal of “carbon peaking and carbon neutrality” and the continuous deepening of the construction of new power systems, the problem of tight supply and demand caused by the intermittent and uncertainty of renewable energy output has become increasingly prominent. In order to ensure the safe and reliable operation of the power system, this paper proposed a new capacity guarantee mechanism to compensate the power plants who provide capacity value for the power system, and the effects of unit output uncertainty and depreciation are also considered. This method can guarantee the construction of new units and the orderly exit of old units. Finally, the balance of power supply and demand in the long term can be reached, and the smooth and orderly progress of energy transformation will be accelerated.\",\"PeriodicalId\":304779,\"journal\":{\"name\":\"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IFEEA57288.2022.10037895\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 9th International Forum on Electrical Engineering and Automation (IFEEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IFEEA57288.2022.10037895","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

随着“碳调峰、碳中和”目标的实施和新电力系统建设的不断深入,可再生能源产出的间歇性和不确定性导致的供需紧张问题日益突出。为了保证电力系统的安全可靠运行,本文提出了一种新的容量保障机制,对为电力系统提供容量价值的电厂进行补偿,并考虑了机组输出不确定性和折旧的影响。这种方法可以保证新机组的建设和旧机组的有序退出。最终实现长期的电力供需平衡,加快能源转型的顺利有序推进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on capacity cost compensation mechanism on power generation companies
With the implementation of the goal of “carbon peaking and carbon neutrality” and the continuous deepening of the construction of new power systems, the problem of tight supply and demand caused by the intermittent and uncertainty of renewable energy output has become increasingly prominent. In order to ensure the safe and reliable operation of the power system, this paper proposed a new capacity guarantee mechanism to compensate the power plants who provide capacity value for the power system, and the effects of unit output uncertainty and depreciation are also considered. This method can guarantee the construction of new units and the orderly exit of old units. Finally, the balance of power supply and demand in the long term can be reached, and the smooth and orderly progress of energy transformation will be accelerated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信