在整个工厂范围内遵守2000年标准的办法

K.D. Jablonski
{"title":"在整个工厂范围内遵守2000年标准的办法","authors":"K.D. Jablonski","doi":"10.1109/PAPCON.1998.685524","DOIUrl":null,"url":null,"abstract":"The Year 2000 presents a problem for all automated systems in any business or industry. Specifically, process control systems in pulp and paper mills critical to production demands can have catastrophic failures if the Year 2000 issue is not addressed. With the vast array of manufacturers and shear number of control systems in today's automation environment, the solution methodology becomes imperative in order to effectively prevent production interruption. This paper outlines an approach to this solution methodology and offers suggestions and insights based on a plan implemented at Longview Fibre Company in Longview, WA. It also includes information about current compliance efforts and compliance status about control systems and devices specific to the Longview mill.","PeriodicalId":360061,"journal":{"name":"Conference Record of 1998 Annual Pulp and Paper Industry Technical Conference (Cat. No.98CH36219)","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1998-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An approach to Year 2000 compliance on a millwide basis\",\"authors\":\"K.D. Jablonski\",\"doi\":\"10.1109/PAPCON.1998.685524\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Year 2000 presents a problem for all automated systems in any business or industry. Specifically, process control systems in pulp and paper mills critical to production demands can have catastrophic failures if the Year 2000 issue is not addressed. With the vast array of manufacturers and shear number of control systems in today's automation environment, the solution methodology becomes imperative in order to effectively prevent production interruption. This paper outlines an approach to this solution methodology and offers suggestions and insights based on a plan implemented at Longview Fibre Company in Longview, WA. It also includes information about current compliance efforts and compliance status about control systems and devices specific to the Longview mill.\",\"PeriodicalId\":360061,\"journal\":{\"name\":\"Conference Record of 1998 Annual Pulp and Paper Industry Technical Conference (Cat. No.98CH36219)\",\"volume\":\"67 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1998-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of 1998 Annual Pulp and Paper Industry Technical Conference (Cat. No.98CH36219)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAPCON.1998.685524\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 1998 Annual Pulp and Paper Industry Technical Conference (Cat. No.98CH36219)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAPCON.1998.685524","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2000年对任何商业或工业的所有自动化系统都提出了一个问题。具体来说,如果不解决2000年问题,对生产需求至关重要的纸浆和造纸厂的过程控制系统可能会出现灾难性的故障。在当今的自动化环境中,随着大量制造商和大量控制系统的出现,为了有效地防止生产中断,解决方案方法变得势在必行。本文概述了该解决方案方法的方法,并根据位于华盛顿州朗维尤的朗维尤纤维公司实施的计划提供了建议和见解。它还包括有关当前合规工作和合规状态的信息,有关控制系统和设备具体到朗维尤工厂。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An approach to Year 2000 compliance on a millwide basis
The Year 2000 presents a problem for all automated systems in any business or industry. Specifically, process control systems in pulp and paper mills critical to production demands can have catastrophic failures if the Year 2000 issue is not addressed. With the vast array of manufacturers and shear number of control systems in today's automation environment, the solution methodology becomes imperative in order to effectively prevent production interruption. This paper outlines an approach to this solution methodology and offers suggestions and insights based on a plan implemented at Longview Fibre Company in Longview, WA. It also includes information about current compliance efforts and compliance status about control systems and devices specific to the Longview mill.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信