{"title":"支持能力成熟度模型软件分包合同管理的工具和指导方针","authors":"Jutawan Saemu, N. Prompoon","doi":"10.1109/APSEC.2004.100","DOIUrl":null,"url":null,"abstract":"Currently, software development organizations implement the software subcontract strategy as a solution to concentrate their core competencies. In order to produce quality project outcome, they should perform the efficient methodology to manage software subcontract process. Software subcontract management (SSM) is a Key Process Area (KPA) in Level 2 of the Capability Maturity Model (CMM). This research proposes a prototype of software subcontract management system for advocating software subcontract activities according to CMM Key Practices by considering the main procedures. A management guidance is also proposed in this research.","PeriodicalId":213849,"journal":{"name":"11th Asia-Pacific Software Engineering Conference","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Tool and guidelines support for Capability Maturity Model's software subcontract management\",\"authors\":\"Jutawan Saemu, N. Prompoon\",\"doi\":\"10.1109/APSEC.2004.100\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Currently, software development organizations implement the software subcontract strategy as a solution to concentrate their core competencies. In order to produce quality project outcome, they should perform the efficient methodology to manage software subcontract process. Software subcontract management (SSM) is a Key Process Area (KPA) in Level 2 of the Capability Maturity Model (CMM). This research proposes a prototype of software subcontract management system for advocating software subcontract activities according to CMM Key Practices by considering the main procedures. A management guidance is also proposed in this research.\",\"PeriodicalId\":213849,\"journal\":{\"name\":\"11th Asia-Pacific Software Engineering Conference\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th Asia-Pacific Software Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APSEC.2004.100\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th Asia-Pacific Software Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2004.100","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Tool and guidelines support for Capability Maturity Model's software subcontract management
Currently, software development organizations implement the software subcontract strategy as a solution to concentrate their core competencies. In order to produce quality project outcome, they should perform the efficient methodology to manage software subcontract process. Software subcontract management (SSM) is a Key Process Area (KPA) in Level 2 of the Capability Maturity Model (CMM). This research proposes a prototype of software subcontract management system for advocating software subcontract activities according to CMM Key Practices by considering the main procedures. A management guidance is also proposed in this research.