{"title":"从PSTN向NGN迁移","authors":"S. Cakaj, M. Shefkiu","doi":"10.1109/ELMAR.2007.4418827","DOIUrl":null,"url":null,"abstract":"\"Modernization of telecommunication infrastructure of PTK \" is a Post and Telecommunication of Kosova (PTK) project. This project was initiated to replace most of the switching and access infrastructue of PTK that was very old, up to semi-automatic exchanges. For this project PTK decided to go for the latest switching technology Next Generation Network (NGN). The project consist of replacement of switches in 6 regions with the new access equipment that would use the same Soft Switch installed at central server room in Prishtina, capital of Kosova. The applied aproach by PTK to make a large step by moving from semi-electronic switches to NGN is presented by this paper.","PeriodicalId":170000,"journal":{"name":"ELMAR 2007","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Migration from PSTN to NGN\",\"authors\":\"S. Cakaj, M. Shefkiu\",\"doi\":\"10.1109/ELMAR.2007.4418827\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\\"Modernization of telecommunication infrastructure of PTK \\\" is a Post and Telecommunication of Kosova (PTK) project. This project was initiated to replace most of the switching and access infrastructue of PTK that was very old, up to semi-automatic exchanges. For this project PTK decided to go for the latest switching technology Next Generation Network (NGN). The project consist of replacement of switches in 6 regions with the new access equipment that would use the same Soft Switch installed at central server room in Prishtina, capital of Kosova. The applied aproach by PTK to make a large step by moving from semi-electronic switches to NGN is presented by this paper.\",\"PeriodicalId\":170000,\"journal\":{\"name\":\"ELMAR 2007\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ELMAR 2007\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ELMAR.2007.4418827\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ELMAR 2007","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELMAR.2007.4418827","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
"Modernization of telecommunication infrastructure of PTK " is a Post and Telecommunication of Kosova (PTK) project. This project was initiated to replace most of the switching and access infrastructue of PTK that was very old, up to semi-automatic exchanges. For this project PTK decided to go for the latest switching technology Next Generation Network (NGN). The project consist of replacement of switches in 6 regions with the new access equipment that would use the same Soft Switch installed at central server room in Prishtina, capital of Kosova. The applied aproach by PTK to make a large step by moving from semi-electronic switches to NGN is presented by this paper.